Station Name: SOUTHBURN
|
Date opened: | 21.4.1890 |
Location: | South side of Main Street |
Company on opening: | Scarborough Bridlington & West Riding Junction Railway |
Date closed to passengers: | 20.9.1954 |
Date closed completely: | 27.1.1964 |
Company on closing: | British Railways (North Eastern Region) |
Present state: | Two sections of much degraded platform remain in a lightly wooded area that now occupies the track bed. A large farm building now stands on the site of the station building, almost up to the remaining platform edge. Two concrete railway gateposts remain at the station entrance and the adjacent three railway cottages are extant with another pair of concrete railway gate posts. |
County: | North Yorkshire |
OS Grid Ref: | |
Date of visit: | 15 September 2010 |
Notes: Southburn was one of four intermediate stations opened on 21st April 1890 on the Scarborough Bridlington & West Riding Junction Railway's Market Weighton - Driffield line. The station served the villages of Southburn and Kirkburn. The station had two facing platforms. The main station building on the down platform, constructed of brick, was of a somewhat intricate design. The main two-storey section, which included the stationmaster’s accommodation, presented a projecting, half-timbered gable-end, with conjoined two-storey wings projecting south; the wing nearer the platform ended with a half-timbered gable, whilst the other had a hipped roof. The single-storey office range, including waiting facilities, extended north from the main block, fronted by a glazed, timber verandah, and ended with a pavilion presenting another half-timbered gable to the platform. Similar buildings were also provided at Middleton-on-the-Wolds and Bainton; the building at Southburn was a mirror image of that at Bainton. A timber waiting shelter, built to the standard NER design, was sited on the up platform. A 17-lever signal box was sited at the north end of the up platform. This controlled access to the goods yard which was behind the down platform. It comprised three sidings one of which had a loop. Two of them served a loading dock and one of these ran on alongside the goods shed. There was a 2-ton crane sited between two of the sidings. Southburn was one of the more profitable stations on the Selby - Driffield line and in 1940 was one of only two stations with an income of over £1 a day in passenger revenue, with a total income of £477 that year. This clearly insufficient to make the station viable and it closed to passengers on 20th September 1954 but remained open for goods traffic until 27th January 1964. After closure of the line all the station buildings were quickly demolished and the platform edge stones removed. By 1976 the track bed had been partially infilled, leaving two short lengths of much degraded platform. This area is now lightly wooded. It was not long, however, before the arrival of railways would ensure the rapid decline in waterborne transport in the area. The Leeds & Hull Railway Company was formed in 1824 with George Stephenson appointed as engineer. He proposed three inclined planes to be worked by three stationary engines for the hilly route out of Leeds, but the remainder of the line was very nearly level. This L&HR was one of a number of contemporary projects aimed at linking the east and west sides of northern England. The Leeds & Hull scheme soon stagnated, due in part to the stock market crash of 1825. In the meantime the Knottingley & Goole Canal opened in 1826, turning Goole into a viable transhipment port for Europe. The growth of Goole as a port to rival Hull was sufficient to spur the Hull-based shareholders of the Leeds & Hull railway into action. At the end of 1828 they motioned that the railway should be built as far as Selby, with the remainder of the journey to Hull being made by steam packet, most importantly, bypassing Goole. The shareholders passed the proposal at a general meeting in Leeds on 20 March 1829, and the Leeds & Selby Railway Company was formed.
In 1835 George Hudson formed a committee to promote a line to be known as the York & North Midland Railway, which was incorporated in 1836. This proposed line would join the North Midland at Normanton, a few miles east of Leeds, and it received its Act of Parliament in 1837. The first section of the Y&NMR opened on 20 May 1839 between York and a junction with the Selby line at Gascoigne Wood, with the remaining section to Normanton opening on 1 July 1840. A spur to Methley Junction, giving access to Leeds via a working arrangement with the North Midland, was opened on 27 July 1840, followed by a southbound curve from the Leeds & Selby at Gascoigne Wood. The line was extended southwards to Burton Salmon by 11 May 1840, with another short chord to the junction with the Leeds & Selby opening on 9 November 1840. The remainder of the Leeds to Hull route was revived by George Hudson as the Hull & Selby Railway. It received its Act on 21 June 1836 and ran almost directly east from Selby to Hull. A bascule bridge was constructed across the River Ouse at Selby, just north of the jetties at the rear of the original Selby station. A new through station to the north opened with the Hull & Selby line on 2 July 1840, and the old station became a goods shed. With the successful opening of their line, the Hull & Selby Railway was the promoter of The Seamer to Filey section opened on 5 October 1846 with the Hull to Bridlington section opening the following day. The final link between Bridlington and Filey, which had been delayed due to difficult terrain, opened on 20 October. During this period of 'Railway Mania' there were proposals to build 107 miles of new railway in East Yorkshire, not all of which would come to fruition. One of these schemes was for a line between Selby and Driffield via Market Weighton, while another line from York to Beverley would also pass through Market Weighton. Although four lines into Market Weighton were eventually completed separately, George Hudson’s York & North Midland held powers for a complete route from York to Hull which was authorised by an Act of 18 June 1846, with a requirement that the line should be completed within five years. On the same date the YNMR (East Riding Branches) No. II Railway Act authorised the building of a 22-mile single-track line from the Hull & Selby line to Market Weighton. Running across flat, open ground with 22 level crossings, the line would have no major engineering features apart from a bridge over the River Derwent at Bubwith,. The contractors for both lines were Messrs. Jackson and Bean, with stations built by Burton & Son. Construction of the line from York started almost immediately with a proposed completion date to Market Weighton of 4 September 1847, the Selby line opening two months later. The latter date soon proved overly optimistic owing to the difficulty in agreeing the siting of Bubwith station and the provision of goods facilities at a number of stations.The double-track York line opened to Market Weighton on 4 October 1847, and the single-track Selby line from Barlby Junction to Market Weighton eventually opened on 1 August 1848 with intermediate stations at Cliff Common Gate, Duffield Gate, Menthorpe Gate, Bubwith, Foggathorpe Gate, Holme (Yorks) and Harswell Gate. An additional station close to Bubwith – known as Bubwith High Field - first appeared in timetables in January 1859: this finally resolved the lengthy dispute about the siting of Bubwith station.
On the opening of the line eleven permanent way men were employed, plus three coaching department staff, costing a total annual sum of £137.16s. Takings in June 1849 were £2,336, made up of £1,335 goods, £924 passenger, £44 parcels, £30 rents and £3 horse and dog conveyance. Initially there were only two passenger trains each day between Selby and Market Weighton and three between York and Selby, and it was suggested that by juggling the timetable only one locomotive would be required to run both services - but this could not be achieved. By 1866 there were four daily trains between Market Weighton and Selby. The route was always used by excursion trains to Scarborough from its opening, with services being provided by the L&YR. Traffic on the York line did not live up to expectations, and it was listed for singling as early as 1853, while the doubling of the Selby line started in 1889. At this time Duffield Gate station closed as it attracted very little traffic. Once the doubling had been completed an enhanced passenger service was introduced. This comprised twelve down and ten up trains, some not operating over the entire line to Selby, and some being expresses over one of the sections. All trains north of Market Weighton, except for one local each way, ran through to Bridlington, and there were several conditional stops, one at Everingham being to take on passengers for London. The isolated station at Enthorpe at first had trains only on Wednesdays, Thursdays and Saturdays. By 1899 the service was even better, with two Selby-Bridlington expresses operating between 10.00 and 11.00 with only 20 minutes between them! Enthorpe was also given a regular service of five trains each way, and generally this line was far better served than the Beverley-York line. From its opening Market Weighton had been a terminus, but it was always intended that the York line should be extended south to Beverley, and the Selby line east to Driffield. The extension to Beverley proved problematic due to the routing of the line across the Dalton Holme Estate. By this time the Y&NMR was in financial difficulty, and they argued that there was now little public demand for the line. This view angered local people and, when the Y&NMR became part of the North Eastern Railway in 1854, the company found itself under local pressure to complete the line. There was much debate, which included a proposal to build a completely new line from Market Weighton to Brough. In 1860 the NER eventually agreed to build the line to Beverley as originally planned, and an Act was granted on 30 June 1862, with work starting in September that year. The single-track extension opened on 1 May 1865. At this time the NER had no plans to extend eastward from Market Weighton to Driffield. In 1884 an independent company, the Scarborough Bridlington & West Riding Junction Railway, projected a route from Seamer; this would bypass Bridlington then pass through through Driffield and Market Weighton, from where it would turn south-west to reach to Howden. This proposal was not greeted with much local enthusiasm and, when the company dropped the west end of the route between Market Weighton and Howden, the NER offered to operate the remaining section of line, but only between Market Weighton and Driffield. Construction started in 1888, and the line opened on 21 April 1890 with intermediate stations at Enthorpe, Middleton-on-the-Wolds, Bainton and Southburn. From the outset the Driffield line had a good service, with most trains running on to Bridlington. There were, however, only three through trains between Selby and Bridlington, two morning (down) trains with one in the evening from Selby and one mid-morning up train and two in the evening; this could hardly be described as a regular service.The Scarborough Bridlington & West Riding Junction Railway was purchased by the NER in 1914. By 1922 the line had settled down to a more regular service with five through down trains and four up trains, and an additional short-running service between Bridlington and Market Weighton. On 29 May 1899 there was a meeting between the Escrick and Flaxton rural district councils and the NER to apply for a Light Railway Order for a line to run from Foss Islands, York, to Cliff Common on the Selby and Driffield line. There were no objections from NER, and the Board of Trade granted the Derwent Valley Light Railway Order in 1902. Four parish councils were against the new line as were 260 individual landowners and ratepayers, and the two councils who had originally promoted the line were now deterred by the high cost, so the powers were allowed to lapse. A new order was granted in 1907, and a new company was inaugurated with capital of £81,000 in £1 shares. This time the councils supported the line, as did local farmers who were eager to use the new facility to get their produce to market. The line opened in stages with the first section between Cliff Common and Wheldrake opening to goods traffic on 29 October 1912; it was an immediate success. The whole line, 20 miles and 19 chains in length, opened to passenger traffic on 21 July 1913. The northern terminus at Layerthorpe connected into the NER's Foss Islands branch, and was also the administrative headquarters of the DVLR. At Cliff Common the DVLR ran into its own platform on the north side of the Selby and Driffield down platform. At this time there was a direct connection with the Selby – Driffield line, which was to prove useful during WW1 when the NER ran some of its Selby - York trains to Cliff Common and then onto the DVLR to York instead of using the East Coast main line. During the 1920s, however, passenger numbers on the DVLR dropped rapidly from 49,000 at the end of the First World War to just 18,000 in 1925 as bus services spread into the countryside. In 1926 passenger services ended, although special excursions did run from time to time. Goods traffic, however, continued to prosper. By BR days this direct connection at Cliff Common had been removed, with a convoluted route through sidings now providing the only connection between the two lines. Following the 1923 general grouping, the LNER improved the service on both the York and Selby lines, with a fast service provided for commuters between Bridlington and Leeds which was achieved in 1 hour 35 minutes. The LNER also experimented with a petrol/electric railcar between Selby and Market Weighton. The 1903-built railcar and its shed at Selby were destroyed in an accidental fire in 1926. A number of steam railmotors were then acquired, and in 1932 two of these were shedded at Selby with another at Bridlington; they made two daily return trips, one mid-morning and the other mid-afternoon.
While the Market Weighton to York service still carried a reasonable number of local passengers, many of the stations on the Selby line were little used: in 1940 Menthorpe Gate took only £17 in passenger fares while Foggathorpe and High Field generated only £29 and £43 respectively. Only Southburn (£477 P/A) and Middleton-in-the-Wolds (£1,615 P/A) were taking more than £1 a day! It therefore came as no surprise when closure of the intermediate stations was announced. Menthorpe Gate was the first to close, losing its passenger service on 7 December 1953, with the rest of the intermediate stations closing on 20 September 1954. All the stations closed to goods traffic on 28 January 1964, except Enthorpe (where the small yard had closed on 14 September1959) and Holme Moor and Everingham, which handled goods traffic until 1965.A limited passenger service between Selby and Bridlington was retained, with one morning train from Selby returning from Bridlington in the evening. There was an additional morning train from Bridlington to Market Weighton with a connection for York, but this was withdrawn before the line closed. Final closure of the line to all passenger traffic was proposed for 15 June 1964. There was an appeal, but it only delayed the inevitable as the Transport Users' Consultative Committee said that they could see no way of alleviating hardship for the very small number who would be affected. The end came on 14 June 1965, and, with the closure of Holme Moor and Everingham goods depots on 2 August 1965, the whole route was completely defunct. Summer excursions which formerly used the line would in future be diverted via Hull. The closure of the Selby - Driffield line meant that the DVLR had now become a dead-end branch from York with the result that the section from Wheldrake to Cliff Common, which had opened first of all, was abandoned from 9 February 1965. Elvington to Wheldrake followed on 19 June 1968 and Dunnington - Elvington on 19 January 1973. The DVLR closed completely on 27 September 1981, but the station buildings and sidings at Layerthorpe came into the hands of British Rail who owned the Foss Islands Branch. This ensured the survival of the station until 1989 when the branch line closed. On the York - Beverley line, the position was rather different. The introduction of diesel multiple units saw a general acceleration of the service which proved popular, but this line too was to fall under the Beeching Axe.Some stations had closed before the 1960s, but passenger services on this line were withdrawn on 29 November 1965, and the remaining stations at Earswick, Stamford Bridge, Pocklington, Londesborough, Market Weighton and Kipling Cotes closed. Today most of the Selby route is traceable, with a 13-mile section between Bubwith and Market Weighton now reopened to cyclists and pedestrians as the Bubwith Rail Trail. There is some evidence to be seen at all of the stations and at some of the goods yards.
Tickets from Michael Stewart, Bradshaw from Chris Hind, route map drawn by Alan Young. To see other stations on the Selby & Driffield Railway click on the station name: Selby (still open), Cliff Common, Duffield Gate, Menthorpe Gate, Bubwith, High Field, Foggathorpe, Holme Moor, Everingham, Market Weighton, Enthorpe, Middleton-on-the-Wolds, Bainton & Driffield (still open) |
||||||||
Last updated: Friday, 26-May-2017 10:59:10 CEST |
© 1998-2011 Disused Stations
|