| Notes: Ditton Station was opened as  Ditton Junction on the 1st  May 1871. The  station was situated on the former St Helens and Runcorn Gap Railway that had  opened between Widnes and Garston on the 1st  July 1852. By 1853 that line had been extended to the east as far as Stockport and on the 15th February 1864 a  connection opened between Speke and Edge Hill which provided access to the  London North Western Railway’s (LNWR) main line station at Liverpool Lime Street. By the end of 1864  the line had become part of the LNWR.
 In 1863 the LNWR began  construction of a new line from Ditton to a point just to the north of the  River Weaver on the main line between Warrington  and Birmingham.  The purpose of the new line that had to cross the River Mersey at Runcorn Gap  was to shorten journey times between Liverpool and London. The new line opened to goods trains  on the 1st February 1869 and to passenger services on the 1st  of April 1869. At Ditton the new line required the laying out of a junction  with the original line and extensive earthworks to create an incline that would  allow the new line to reach the required height so that it could cross the  River Mersey with 75 feet of clearance which was required by the Admiralty.  There had been a station at Ditton called Ditton Mill since 1851 but the alterations required for the new route meant  that this station had to close. Ditton Junction was built as replacement for  the earlier station.
 
                Liverpool, Warrington, Manchester and points to the  east, and a local service to St Helens which terminated at the station. Within  twenty years direct services also ran to Chester. 
                  |  | Ditton Junction station was  located on the west side of a road overbridge. Its booking office was located  on the overbridge and it straddled the line. The book office was a brick built  single storey building with archway windows and doors. At the high point of the pitched roof glass  panelling was provided to provide natural daylight into the building. A  footbridge connected down to three island platforms, which gave six platform  faces. The station was not at the time of its opening located in an area of  large population but its size reflected its importance as an interchange  junction. Each platform was provided with brick built waiting facilities and  staff accommodation. Canopies were also provided to protect passengers from the  weather.  Goods facilities, including a  cattle dock were also provided. At the time of its opening  Ditton Junction would have been served by train services running to London and  other points in the south,  |  On the 17th  September 1912 a serious crash occurred at the station when a the 5.30 Chester  to Liverpool Train hauled by Precedent 2-4-0 No. 1529 Cook with two horse boxes  and seven coaches descended the 1 in 114 from the Bridge at 60 mph hit the road  bridge at the station. The accident occurred because of confusion over signals.  The driver thought that the train was to take the fast lines through the  station but in fact the points were set for the slow lines. The train crew were  killed along with all of the passengers in the first two coaches. A horse was  thrown right over the bridge but somehow managed to survive.
 By the early part of the 20th  century services had settled into a pattern that included several Liverpool to London and return  workings each day. Peak hour services between Liverpool and Manchester Oxford Road, peak hour  services between Manchester Oxford    Road and Liverpool and local services between  Liverpool and Crewe and Liverpool and Chester.  Less frequently services also operated between Liverpool and North   Wales. Services also started and finished at Ditton Junction.  These included the local service to St Helens, a service to Hartford and off peak services to Manchester Oxford Road  and to Warrington Bank Quay.
 
 In 1923 Ditton Junction  became part of the London Midland and Scottish Railway (LMS). Nothing much  altered during the LMS era other than livery changes. Ditton Junction remained  a busy junction station on a busy main line.
 
 In 1948 Ditton Junction  became part of the British Railways (London Midland Region). During the Second  World War the St Helens service had been  reduced to allow more goods services to run. By 1951 the service had still not  been restored to its pre war levels and it was discontinued on 18.06.1951. Other  services at Ditton Junction were not really affected by the loss of this  service as connections with other trains had not been very good anyway.
 
 Between 1960 and 1961 the  station was completely rebuilt in a modern style to accommodate the  electrification of the Crewe to Liverpool  Line. One of the platform faces, on the south side of the southernmost island  platform, was dispensed with leaving the station with five platform faces. The  booking office and platform buildings were all rebuilt with plenty of  accommodation for passengers who who would be changing trains. It was ironic  therefore that the Manchester Oxford Road service, and its shorter workings to  Warrington were withdrawn on 10.9.1962, all intermediate stations between  Ditton and Timperley closed on the same day with the exception of Warrington  Bank Quay Low Level which continued to be served by one train per week until  1965. In 1965 Ditton lost its five remaining London Euston services and goods services were withdrawn on 31.5.1965.
 
 The only remaining  passenger services were an hourly service between Liverpool and Crewe and a  less frequent service to Chester.  'Junction' was dropped from the stations name in 1973 although only the totem  signs were replaced with the new name ‘Ditton’. The stations lamp covers  continued to carry the name 'Ditton Junction' until the stations closure in  1994. By the late 1970s the Chester service operated only in the summer  months and it was discontinued in the early 1980s.
 
 By the late 1980's many  trains on the Liverpool and Crewe service had  started to omit Ditton from their scheduled stops. By the early 90's only a  couple of trains called at the station and then only at peak times leaving a  gap of several hours in the timetable. Not surprisingly very few people used  the station and it made headline news when it closed on 27th May  1994 as it was the first post privatisation station to be closed by the new  track company Railtrack. To publise what many saw as a bad omen of the new  privatisation era a mock funeral, complete with coffin was held on the stations  platform as the last train, a class 142 Diesel Multiple Unit departed towards Liverpool.
 The platform level buildings  were demolished shortly after closure. The street level building survived,  until June 2005 when it was demolished. Rail activity around the site of Ditton  Station has become more frequent in recent years as many new freight facilities  have been created a short distance to the east of the station site. Freight  trains that serve these new facilities run into Ditton sidings before they are  propelled into the freight terminals.
 To see the other 
                stations on the Ditton Junction to Skelton Junction Line click 
                on the station name: Widnes 
                South, Cuerdley, 
                Fidlers 
                Ferry & Penketh, Sankey 
                Bridges, Warrington 
                Bank Quay Low Level, Warrington 
                Arpley, Latchford, 
                Thelwall, Lymm, 
                Heatley & 
                Warburton, Dunham Massey & Broadheath.
 |