Station Name: GALASHIELS


[Source: Nick Catford]


Date opened: 20.1.1849
Location:

South side of Station Brae

Company on opening: North British Railway
Date closed to passengers: 6.1.1969
Date closed completely: 6.1.1969
Company on closing: British Rail (Scottish Region)
Present state:

Demolished with no evidence remaining. The site of the station and goods yard is now a car park for an Asda store which has been built on the site of the engine shed. A new Station Brae bridge was built in 2007 for the line that is under construction from Edinburgh Waverley to Tweedbank. A strip of land has been retained on the east side of the site to accommodate this line.

County:

Selkirkshire

OS Grid Ref: NT495361
Date of visit: 6.5.2011

Notes: Galashiels was the first major town on the Waverley route after leaving Edinburgh, 33½
miles to the north. With a population of 14,000, Galashiels provided the majority of the passenger and freight traffic for the route.

The town is situated around the Gala Water, a River Tweed tributary and is the administrative centre for Selkirkshire. It was one of the main centres for the Scottish woollen industry, famous throughout the world for its quality tweeds.

Galashiels station opened on 20 February 1849 as part of the NBR's line to Hawick which itself did not open until 1 November of that year. It was to become an important interchange station serving Selkirk branch trains from 1856 and the Peebles loop from 1864. There were two facing platforms with three faces, the platform on the east side being an island. The outer face served trains from Peebles or for Selkirk.

The main station building on the down side comprised a 2-storey 'T' shaped stone building with an entrance portico giving access to the booking and stationmaster's offices. Three waiting rooms faced onto the platform: gentlemen's first class, ladies’ first class and ladies’ second class. The upper floor of the building was the stationmaster's house. An adjacent
single-storey stone building included the gents’ toilet, lamp room, superintendent's room and guards' room. As built the station had an overall roof (trainshed) but this was removed in the 1930s and replaced with substantial canopies, spanned by iron girders for additional support. The platforms were spanned by a covered footbridge on the north side of Station Brae bridge. The road bridge which passes over the station was replaced with a new girder bridge a few yards to the north in 1938. It is likely that the trainshed was removed at this time. .

There were substantial goods facilities at Galashiels and originally no fewer than five signal boxes, ultimately replaced with a single box at the north end of the station. The entrance to the goods yard was from the station forecourt where there was a weighbridge, with a second weighbridge in the yard. As built the yard comprised 5 sidings, although more were added later. One of the sidings passed through a large stone goods shed with a hipped slate roof. There was a 6-ton crane in the yard. Private sidings were provided, including facilities to serve J & W Cochrane's Mid Mill, Cochrane Brothers' (Netherdale) and Galashiels Gas Works, to the south,. There was a well opposite the up platform with a steam pump in an adjacent pump house.

Initially there was no engine shed at Galashiels, but there was an open stabling point with a turntable and two radiating roads, and what appears to be a coaling platform on the down side immediately north of Station Brae bridge. In about 1903 a two-road brick shed was eventually provided 200 yd south of the station with a coaling stage and a second turntable to the west. The original turntable remained in use but had gone by 1964. There was a water tank on a stone tower opposite the up platform and water columns at the end of both platforms.

At 4.00 pm on 14 December 1916 passengers on a Peebles - Galashiels service had a narrow escape. Having passed through Landhope Tunnel the train entered the cutting north of Galashiels station. At this point there was a substantial brick retaining wall. The wall had required strengthening on several occasions with buttresses and, later, steel rails being added. Cracks had appeared earlier that day, and the wall had been seen to move, and workmen were on site making repairs. Just after the train pulled into the station there was an enormous landslip, and 70 yd of the wall collapsed bringing hundreds of tons of soil down onto the track; the workmen were only just able to escape in time. The main line remained blocked for several days. The impressively rebuilt walls remain intact today.

The engine shed, which was a sub-shed of St. Margarets, closed in April 1962 and was then used for loco storage including the A4 60026 'Miles Beevor'.

After closure to passengers in 1969 Galashiels remained open for goods traffic until 28 April 1969. The track was lifted in 1971 and the goods shed became a National Parcels Depot, but by 1977 little remained apart form some short sections of platform supporting the Station Brae bridge.

The site was eventually redeveloped in 2006. This included the demolition of the Station Brae bridge with an Asda store and car park being built on the site. The car park occupies the site of the station and goods yard with the Asda store on the site of the engine shed.

Since 1994 a campaign has been steadily gathering pace for a reinstatement of the railway between Edinburgh and Galashiels. This eventually came to fruition in 2006 when the Waverley Railway (Scotland) Act was passed by the Scottish Parliament. In 2007 a new Station Brae bridge was built in preparation for the new Galashiels station which is expected to open in 2014. The new station will be north of the original site and will comprise a single platform alongside the A7 and opposite the bus station, which will be an interchange point for travellers to Hawick, Selkirk and other Borders towns not directly served by the new railway. No new parking will be created here with drivers encouraged to use the Park & Ride facilities to the south of the town at the Tweedbank terminus.

BRIEF HISTORY OF THE WAVERLEY ROUTE
The Waverley route was a double-track railway line that ran south from Edinburgh in Scotland through Midlothian and the Scottish Borders to Carlisle in England. It was built by the North British Railway Company; the first section, from Edinburgh to Hawick opened in 1849. The final section, Hawick to Carlisle, opened in 1862. It was named the Waverley route after the novel by Sir Walter Scott (who was born in Edinburgh and eventually lived near Melrose).  The line closed to passengers in 1969, but reconstruction work of the Edinburgh-Galashiels-Tweedbank section was scheduled to begin in 2008, and is now anticipated for 2011.

The Edinburgh and Dalkeith (‘Innocent’) Railway, was the first to serve Scotland’s capital city. It carried coal from the mines in Lothian to its city centre terminus at St Leonards.

It received Royal Assent on 26 May 1826 as a horse-drawn tramway built to the Scottish gauge of 4 ft 6 in and linked various coal mines to the south-east of Edinburgh. The line was commissioned by a business consortium led by Walter Montagu-Douglas-Scott, 5th Duke of Buccleuch, with the engineering plans being contributed by Robert Stevenson.

Two further Acts were obtained; the first, on 4 June 1829, sanctioned the Leith Branch, running from Niddrie to Leith. The second, in 1834, authorised further branches to Fisherrow and Musselburgh and allowed a certain amount of passenger traffic by horse-drawn railway coaches.

The first section of the line opened for goods traffic from Edinburgh St Leonards to Craighall Colliery, between Niddrie and Millerhill, on 4 July 1831. This was extended to South Esk (renamed Dalhousie in July 1847) in October 1831 with a branch to Dalkeith opening on 26 November 1838. 

A full passenger service was introduced by the contractor MJ Fox between St. Leonards and South Esk on 2 June 1832; this quickly proved profitable, and the company started operating its own passenger trains in 1834, taking over all passenger workings in 1836 with a service to Dalkeith opening in autumn 1839.

There were no fixed stopping places with passengers joining and alighting wherever they requested; as a result there were no tickets. By 1843 some 'authorised' stopping places had been agreed, and an 1844 map produced by the North British Railway showed stations at Portobello, Niddrie Junction, Cairney, Sheriffhall, and Lasswade Road (at, or near, the later Eskbank station).

The North British Railway made an approach to buy the line, which would be incorporated into a proposed new route between Edinburgh and Hawick; this received parliamentary authorisation in 1845. Due to the ongoing success of the existing enterprise, the NBR had to pay the high price of £113,000, the sale being completed in October 1845. It appears that some alteration to the course of the line was made between 1838 and March 1844 when the NBR produced a map showing its plans for route.
The line was subsequently converted to standard gauge and doubled, reopening to Dalhousie in July 1847. The stations at Cairney, Sheriffhall and Lasswade Road were not reopened.

Construction of the extension to Hawick was rapid, opening in stages as the line forged its way south. Gorebridge opened on 14 July 1847 and by 20 February 1849 it had reached Galashiels, finally arriving at Hawick, where a terminus was opened on 1 November 1849.

By this date there was considerable rivalry between railway companies, and this soon turned into acrimony, with opposing plans to extend south into England. In 1846 the NBR applied to Parliament for further powers to extend the line through Langholm to Carlisle. The Caledonian Railway opposed this extension, and in due course the North British Company’s plans were thrown out by the government committee. Matters dragged slowly on, with meetings in Hawick of many of the manufacturers who felt the need for a railway to the south. No substantial progress was made until 1856 when a survey was made of the Liddesdale route. The Caledonian Railway also had plans for a station in the Lower Haugh in Hawick, with a railway through Teviotdale and Langholm to Carlisle.

To the astonishment of many inhabitants, the claims of the Langholm line were approved and those of the Liddesdale scheme rejected. So indignant were the supporters of the Liddesdale railway that a meeting outside the Town Hall in Hawick attracted some sixteen hundred people expressing the view that the decision was totally against the wishes of the people of the south of Scotland. An appeal was taken to the House of Lords which resulted in the Langholm Bill being thrown out.

In 1859, the railway battle raged again before Parliament, and on the 21 July 1859, having changed its name from the Hawick & Carlisle Junction Railway, the Border Union (North British) Railway Act received the Royal Assent - the North British Railway had won at last. Langholm had come close to having a through line to Hawick, worked by the Caledonian Railway
Company, but it had to be content with a branch line from the Liddesdale route. Another line from Longtown to Gretna, to connect with the Glasgow and South Western Railway, was also included in the Act.

Within six weeks construction was underway at Hawick with intense interest from the townsfolk. The first sod was cut on 7 September 1859, and the day was declared a public holiday in the town with special trains bringing visitors from the north.  As the railhead progressed south sightseeing tours were arranged from the town to view the construction.


In order to accommodate the extension the original terminus at Hawick was closed (becoming the town's goods station) and a new through station was built on a new alignment to the south, taking the line on a viaduct high above the River Teviot. Beyond Hawick the line passed through difficult terrain requiring heavy engineering works, with steep gradients and viaducts (notably the magnificent 15-arch structure near Shankend) before reaching the 1208 yd summit tunnel at Whitrope, 1006 ft above sea level.

South of Hawick a deviation from the original route took the line close to Stobs Castle in the hope that a station there might generate passenger revenue in the future, despite a tiny local population. In fact many of the new stations did not serve any sizeable communities; it was hoped that that these stations would attract traffic from the surrounding farms giving them the opportunity to send their produce to market.

Two miles south of the summit in the 'middle of nowhere' the NBR built what was to become one of the most famous junction stations in Britain in the heart of the Lees Bog.  Prior to the railway, apart from a remote shepherd’s bothy, there were no buildings or inhabitants in the area, but the railway brought its own community in the form of Riccarton railway village
comprising terraced housing, a shop on the station platform, a school and a three-road engine shed with room for six locomotives; a two-road carriage shed, two signal boxes, a gas plant, turntable and coaling facilities were also provided. At Riccarton, the line made a junction with the Border Counties line extension running through Reedsmouth and Bellingham to the Tyne Valley line at Hexham.

The new community at Riccarton, 1½ miles from the nearest road, had no doctor, so a light engine was kept permanently in steam at Hawick to convey emergency services to the village when required.  Initially Sunday worshippers used the engine shed, then the waiting room, a minister walking from Saughtree on the Border Counties line to officiate at the services. Eventually church trains were provided to take worshippers to Newcastleton and Hawick on alternate Sundays.As the Borders Counties line was already open, Riccarton opened early, before all the railway facilities were completed.

The line continued south through open country before reaching Newcastleton, the first community of any size since leaving Hawick, 21 miles to the north. Three miles further south the line crossed into England at Kershopefoot. A further six miles south was Canobie Junction (later to become Riddings Junction), the junction for the Langholm branch which opened to Canobie (later called Canonbie) in May 1862, and to Langholm on 14 April 1864.

The only other major settlement on the route was Longtown. The original plan was to join the Caledonian Railway at Rockliffe, four miles north of Carlisle, but with so much animosity between the two companies the NBR were forced to seek an alternative route into Carlisle, joining the Port Carlisle & Silloth Railway (which they later absorbed at Canal Junction) a mile north-west of the town centre, after which it eventually joined the Caledonian for the final short run into Carlisle Citadel station.

The new line opened in four stages, with goods traffic running between Canal yard in Carlisle and Scotch Dyke from 15 October 1861 and passenger traffic commencing over that section on 30 October. The line from Longtown to Gretna opened on 1 November 1861. The section between Scotch Dyke and Newcastleton opened to traffic on 1 March 1862, with
Newcastleton to Riccarton Junction following on 2 June 1862. Finally, the Riccarton to Hawick section opened with through freight trains to Edinburgh, running from 23 June 1862, and passenger services were introduced on 1 July 1862. Although the line had been engineered for double-track only a single track was laid between Riddings and Riccarton, but this had been doubled by 1863.

Initially traffic over the southern section of the route was very limited, and the board considered selling that part of the line, or - if no buyer was forthcoming - closing it. However, with the opening of the Settle & Carlisle line in 1876, passenger numbers improved with through trains running from St Pancras station in London: St. Pancras to Edinburgh became renowned as one of Britain’s most scenic main line railways.  

The significant gradients and bleak moorland terrain made the Waverley arguably the most difficult line in the UK for steam locomotive crews to work. From Edinburgh Waverley the climb started on the city outskirts, continuing for several miles at 1 in 80, with a moorland summit at Falahill loop. It then descended at a similar rate to the woollen manufacturing towns of Galashiels, Melrose and St Boswells and through the fertile farmland of mid-Tweeddale and Teviotdale before reaching Hawick and ascending for twelve miles at 1 in 80 again through Stobs and Shankend to Whitrope Summit, the highest point on the line amidst desolate moorland. Following Whitrope Tunnel, the line descended at an unbroken 1 in 75 for over eight miles through Riccarton Junction and Steele Road to Newcastleton. Following this, easier gradients led the route to Carlisle down the valley of Liddell Water and into the plains surrounding the Solway Firth.

In 1923 the North British Railway came under the jurisdiction of the London & North Eastern Railway (LNER) at the Grouping. However the two expresses from London had traditionally run via the Midland Railway's main line. Since the Midland became part of the London Midland & Scottish Railway (LMS) group, the daytime ‘Waverley' express and overnight sleeping car train would be hauled by LMS locomotives to Carlisle, then switch to an LNER locomotive for the final leg to Edinburgh Waverley.

The expresses were limited-stop, and in the 1950s they covered the mileage from Carlisle to Edinburgh in roughly two-and-a-half hours. Motive power was usually in the form of a Gresley A3 Pacific locomotive, a class unsuited to hill climbing. With large driving wheels and three cylinders they were designed for running long stretches in excess of 80 mph on heavy
expresses; however the 'Waverley' express was typically eight coaches in length, and speeds on the Waverley Route were limited to 70 mph, and the many tight curves required more severe speed restrictions. On the climb from Newcastleton to Whitrope Summit the train would be down to 30 mph by Steele Road, with the locomotive being worked flat out. Other passenger services (usually three per day) were also worked by A3s, although Thompson B1 4-6-0s made regular appearances. There was also a daily Gresley A4 diagram between Edinburgh and Carlisle - an overnight fitted freight southbound, returning with the early morning parcels train. Thompson Pacifics appeared later on, just before the line was dieselised, in a drive for efficiency. In addition there were also several local passenger workings between Galashiels and Edinburgh (some via the Peebles loop, which opened in stages between Galashiels and Eskbank between 4 July 1855 and 1 October 1864) and between Hawick and Carlisle. These tended to be hauled by B1s.

After the end of steam, a variety of diesels worked passenger trains, especially Class 24 and 26 Sulzer-engined diesels, and even Class 17 (Claytons) on local stoppers. Long distance loco-hauled trains were often covered by Class 45 (Peaks). DMUs worked the local services between Galashiels and Edinburgh.

Freight workings were heavy and frequent, hauled by a multitude of classes. The significant workings were pulled by Gresley V2 2-6-2s and Gresley K3 2-6-0s as well as A3s. V2s provided service for over 30 years. In the 1960s, once the short-lived marshalling yards at Carlisle Kingmoor and Edinburgh Millerhill were opened, they worked hourly freights through the day and night. Depending on the maximum speed of the freight working, a Carlisle to Edinburgh freight could take anything from four to seven hours to travel the route. There were also stopping freight trains that worked from Hawick to Edinburgh and Hawick to Carlisle and back, each taking a full day to complete the round trip, stopping to shunt at every station yard. These tended to be hauled by J39 0-6-0 locomotives, although BR standard class 4 2-6-0s replaced them later on.

One notable working in later years was a daily Halewood (Liverpool) to Bathgate freight train carrying Ford cars on carflats. Due to the heavy load, the booked motive power was a Gresley V2 and a Stanier Class 5 double-headed, usually with the V2 on the front.

At Nationalisation almost the entire Waverley route was given to the Scottish Region, of which 16 miles were within Cumberland (England) from Kershope Foot to Harker inclusive. In 1959 the London Midland / Scottish regional boundary was adjusted to be a little south of Riddings, transferring Longtown and the closed Scotch Dyke stations to the LMR. This arrangement still allowed the Langholm branch to be directly connected to the Scottish Region at Riddings Junction. LM totems were fitted at Longtown and Scottish ones at Riddings Junction (and the three Langholm branch stations), Hawick, Melrose, Galashiels, Stow, Fountainhall, Heriot, Tynehead, Gorebridge, Eskbank & Dalkeith. Until closure LNER nameplates were retained at Riccarton Junction and St Boswells.

The Waverley Route was included in the list of passenger services to be withdrawn under the ‘Beeching Axe’. In October 1966 British Rail gave notice to close the line from 2 January 1967, with closure notices posted at all stations. A brief reprieve was announced, and the situation was on hold pending review; however on 15 July 1968 the Minister of Transport, Richard Marsh, gave the final order that the line would close in January 1969. A huge public outcry ensued, and there followed a high profile campaign to save the line. This ultimately was unsuccessful in preventing the closure.

In spite of the protests, the line was closed on Monday 6 January 1969. The last passenger service on the line (and the last train to traverse the entire route) was 1M82 21.56 Edinburgh - St. Pancras sleeper, on Sunday 5 January 1969, hauled by Class 45 D60 ‘Lytham St Annes’.

Feelings were running high along the route on the final weekend of passenger operations, with protestors evident at most stations. Anticipating the potential trouble, the authorities sent a Clayton 'pilot' engine ahead of 1M82 from Hawick to 'prove' the route south after a set of points at Hawick had been found to be tampered with.

At Newcastleton, the pilot engine found the line was blocked and the level crossing gates locked by protestors. The disturbance led to the arrest of the local minister, and he was released only after David Steel, MP, who was travelling on the sleeper service, negotiated with the police. This caused 1M82 to arrive 2 hours late in Carlisle.

On the afternoon of 6 January at Riddings Junction, BR staged a track-lifting 'ceremony' for the press, to split the London Midland and Scottish Regions, demonstrating their determination to close the route.

After the passage of 1M82, the line was formally closed to passengers. The section between Hawick and Longtown closed completely and came under engineers’ possession for dismantling.

The closure of the Waverley Route created a railway desert in the Anglo-Scottish border area. The cluster of Border towns- Hawick, St Boswells, Melrose, Galashiels (and Selkirk, closed in 1951) was left conspicuously isolated from the railway system, reliant on services at the distant stations of Carlisle, Lockerbie, Edinburgh and Berwick-upon-Tweed, and reached by roads of indifferent quality. Hawick, with a population approaching 20,000, was 43 miles from the Carlisle railhead, making it Britain’s most inaccessible town by rail. Despite its attractive scenery the area was generally bypassed by tourists, and its economy stagnated in the following decades as the traditional textile industries declined.

Freight traffic continued until 28 April 1969 as far as Hawick with a daily service, mainly of coal traffic from Lady Victoria Pit. The signalling was drastically reduced after passenger closure with 'telephone and notice board' working. At the southern end of the route the line between Carlisle Kingmoor and Longtown remained open to traffic until 31 August 1970 when it was cut back to Brunthill. The section from Carlisle Kingmoor to Brunthill remains open to this day and sees periodic freight traffic.

Track-lifting had begun, but was temporarily halted in early 1969 while British Rail negotiated with a private consortium, the Border Union Railway Company, to discuss buying the infrastructure. Various options were put forward to keep the route open such as singling large sections of the track and reducing the number of signal boxes; however this came to nothing, and British
Rail ceased negotiations on 23 December 1969 after requesting hefty interest payments to keep the infrastructure 'in situ' while funding of the required £1 million capital was sought.An inspection saloon ran over the route in early 1970 to allow contractors to bid for the demolition work. Track-lifting started in earnest, and trains could be seen from time-to-time on the route undertaking dismantling duties. The down line between Hawick and Longtown was lifted by 1 April 1972, the up line having been lifted by February 1970. The entire route between Longtown and Newtongrange was removed by early 1972. The final stretch from Newtongrange to Millerhill was closed on 28 June 1973 and removed soon after.

The last train to cross Hawick station viaduct did so on 18 April 1971. Hauled by locomotive No. D3880, it was employed on track-lifting duties, removing the line to its rear. Demolition of the viaduct over the River Teviot commenced nine months later on 1 September 1975.

Omissions in the decision process have been pointed out since the closure, which might have resulted in the line remaining open. For example, construction of significant new housing in Galashiels was underway at the same time as railway closure procedures.

In the late 1990s there was some discussion about reopening the southern section from Carlisle as far as Riccarton Junction. Trees in the afforested area surrounding Kielder were approaching maturity, and the significantly increased logging traffic threatened to congest the narrow roads and inconvenience the local population. Reinstating a single track was seen as an option to provide transport capacity for heavy loads, bypassing the villages, but the project was not pursued.

At Whitrope Siding (just short of) Whitrope Tunnel track panels have been re-laid by the Waverley Route Heritage Association (WRHA) as part of a heritage railway which, in 2011, stretches from the tunnel for about half-a-mile. A heritage centre and station has also being constructed at Whitrope as part of the WRHA activities. Some track was also laid at Riccarton Junction, but this has now been lifted. (Track has also been reinstated at Saughtree, the first station beyond Riccarton on the Border Counties line.)

As noted earlier, the Border towns suffered economic stagnation following the removal of their railway services. The devolved Scottish government, vested with authority to plan the nation’s transport system, was persuaded that reinstatement of the northern section of the Waverley Route could play a significant role in restoring the prosperity of the area.
Consequently the Waverley Railway (Scotland) Act was passed by the Scottish Parliament by 114 votes to one; the Bill received Royal Assent in July 2006. It will reopen the line as far as Tweedbank, just south of the Burgh of Galashiels. £115 million has been allocated for the proposed route and services which will extend an existing Edinburgh suburban service from Newcraighall to Shawfair, Eskbank, Newtongrange, Gorebridge, Stow, Galashiels and Tweedbank.

On 27 March 2007, Transport Minister Nicol Stephen formally initiated preparatory works. Vegetation clearance took place with a view to construction starting in 2009, the first trains expected to be running by 2011. In August 2008, the timelines were adjusted, with tendering starting in 2009, final tendering beginning in 2010, groundwork commencing in early 2011, and trains running in early 2013. In November 2009 it was announced that the reopening would be delayed for a year.

Services are now expected to start in 2014.On 3 March 2010, Transport Minister Stewart Stevenson cut the first sod of the Borders Rail Project in Galashiels. This, and the beginning of ancillary works marking the official start, activated the Waverley Rail Act; this allowed the project to proceed and formally triggered a clause within this Act of Parliament that commits the Scottish Government to complete the scheme within five years. Main construction is due to start in 2011.

On 27 March 2007, Transport Minister Nicol Stephen formally initiated preparatory works. Vegetation clearance took place with a view to construction starting in 2009, the first trains expected to be running by 2011. In August 2008, the timelines were adjusted, with tendering starting in 2009, final tendering beginning in 2010, groundwork commencing in early 2011, and trains running in early 2013. In November 2009 it was announced that the reopening would be delayed for a year.

The Borders Railway opened from its temporary terminus (since 2002) at Newcraighall to Tweedbank on Sunday 6 September 2015. On the previous day, however, trains were run to allow local people – holders of ‘Golden Tickets’ – to ride on their new railway. On the first day of normal services, trains which would normally be 2-car were strengthened to six in anticipation of high numbers of passengers. Class 158 and 170 diesel multiple units were used.

The formal opening took place on Wednesday 9 September, when Her Majesty Queen Elizabeth II, the Duke of Edinburgh, Scottish First Minister Nicola Sturgeon and other dignitaries travelled on a special train from Edinburgh hauled by A4 No.60009 Union of South Africa. The train called at Newtongrange, where Her Majesty unveiled a plaque, then continued to Tweedbank. Here another plaque was unveiled and speeches were given by Her Majesty and the First Minister. Publicity of the occasion was intensified because the Borders Railway opening coincided with the day on which the Queen became Britain’s longest-reigning monarch. The following day the A4 locomotive began a series of 16 steam-hauled special trains, promoted jointly by ScotRail and Steam Dreams.

The platforms at Galashiels and Tweedbank have been built of sufficient length to accommodate such steam charter trains, but unfortunately there are no run-round, turntable or turning triangle installations at Tweedbank, so locomotives must head and tail the trains. Although it is hoped that steam specials will continue to be a frequent feature of the line, Pritchard (Today’s Railways UK Vol.167) remarks that because of the restricted line capacity (most of which is single track) on weekdays the running of a steam special requires the cancellation of two service trains to accommodate them. He warns, ‘this situation really needs to be resolved as soon as possible to preserve the credibility of the line’.

Early indications (late October 2015) are that the Borders Railway is proving popular. Station announcements have been made, almost in sombre tone, that some services scheduled for 2-cars will be formed of 4-cars. The author (AEY) on visiting the line on 21-22 October met various passengers who spoke in glowing terms, just six weeks after its inauguration, of the value of the service to their daily lives. However a local resident who had recently arrived in Stow was puzzled and disappointed by the failure of alternate trains to call there.

All stations from Brunstane to Tweedbank inclusive are unstaffed and freight is not handled.

Tickets from Michael Stewart, Bradshaw from Chris Totty, route map drawn by Alan Young.

Film 1 Hindsight - Borders Television report on the closure of the Waverley Route (6.39)
Film 2 Last days of the Waverley (5.09)
Film 3 Tracks being lifted on the Waverley line (1.20)
Film 4 Whitrope Tunnel - film about the Waverley Route Heritage Association (4.03)
Film 5 Train runs again on the Waverley Line - filmed at Whitrope Siding (0.47)
Film 6 Borders Railway Waverley route building begins at Millerhill (3.48)

Sources:

Additional  bibliography:

To see other stations on the Waverley Route click on the station name:
Port Carlisle Junction, Parkhouse Halt, Harker (2nd site), Harker (1st site), Lyneside, Longtown, Scotch Dyke, Riddings Junction, Penton, Nook Pasture, Kershope Foot, Newcastleton, Steele Road, Riccarton Junction, Whitrope Siding, Shankend, Stobs, Stobs Camp, Hawick (2nd site), Hawick (1st site), Hassendean, Belses, Charlesfield Halt, St. Boswells, Newstead, Melrose, Bowland, Stow, Fountainhall, Heriot, Tynehead, Fushiebridge, Gorebridge, Newtongrange, Dalhousie, Eskbank & Dalkeith, Lasswade Road, Glenesk, Sheriffhall, Millerhill, Cairney & Niddrie

See also Dalkeith

See also the Salkirk branch:
Abbotsford Ferry 1st site, Abbotsford Ferry 2nd site, Lindean & Selkirk

See also the Peebles loop
Bonnyrigg, Rosewell & Hawthornden, Rosslynlee, Rosslynlee Hospital Halt, Pomathorn, Leadburn, Earlyvale Gate, Eddleston, Peebles 1st, Peebles 2nd, Cardrona, Innerleithen, Walkerburn, Thornilee, Angling Club Cottage Platform
& Clovenfords


Galashiels station on 5 April 1906 with a special train commemorating the 50th anniversary of the opening day of the Selkirk branch. Loco No 79 was a 4-4-0, D51 class passenger tank. Designed by Drummond, it was built between 1880 and 1884 at NBR's Cowlairs Works and was used mainly on suburban passenger services. Withdrawal of the class started at the grouping in 1923, with the final three locos withdrawn in 1933
Copyright photo from John Alsop collection




1859 1:2,500 OS Map

1880 1:500 OS Map town plan

1899 1:2,500 OS Map

1932 1:2,500 OS Map

Galashiels station c.1930s, before the overall roof was removed.
Photo from John Mann collection

Galashiels station forecourt c.1930.
Photo from John Mann collection

62428 'The Talisman' is seen working a class B, stopping passenger service south from Galashiels in 1948. Built in September 1914 by the NBR at Cowlairs, this loco was originally numbered 419 and renumbered to 9419 by the LNER upon grouping. Renumbered again by the LNER in 1946 to 2428 and BR to 62428, this loco lasted over 44years in service being withdrawn from 64G, Harwick shed on 31.12.1958 and scrapped by Motherwell Machinery and Scrap in Feb 1960.
Photo from Bill Lynn collection

Galashiels station looking north in August 1950. A Selkirk train stands in the platform.
Photo from John Alsop collection

B1 No. 61354 arriving at Galashiels station in April 1962 with an Edinburgh to Carlisle train. Built in 1949 at Darlington Works for BR, this Thompson-designed B1, 61354 lasted until it was withdrawn from 62B, Dundee Tay Bridge shed on 22,4,1967 and scrapped at McLellans, Langloanin September
of the same year.
Photo by Brian Johnson

A southbound passenger train at Galashiels station in early 1960s. 60538 was built by BR at Doncaster Works in June 1948, to a Peppercorn LNER design and named ‘Velocity’. Classified A2, it only had a short life being withdrawn on 12.11.62 and scrapped at Doncaster in May 1963. The final A2 to be withdrawn was 60532, ‘Blue Peter’, from Aberdeen Ferryhill shed, and this went to preservation.
Photo by from Bill Lynn collection

60031 is a Gresley A4, built in 1937 at Doncaster works and named 'Golden Plover'. Numbered 31 by the LNER, they renumbered it in the early 1940s to 4497 when, upon passing to BR, it received 60031. Seen here at Galashiels on 18 April 1965 working 1X50, the Stephenson Locomotive Society/Branch Line Society’s ‘The Scottish rambler No4' Railtour. The loco was withdrawn from 65B, St Rollox on 29.10.1965; it was scrapped by Campbells, Shieldhall in December of the same year.
Photo by Robin Barbour courtesy of Bruce McCartney from Railscot web site

A northbound stopping service arrives at Galashiels station the 1960s. 61397 is a Thompson LNER-designed B1 built by North British Loco for British Railways in March 1952. It was based at 64A, Edinburgh St Margarets shed, from where it was withdrawn on 26.6.1965 and cut up by Shipbreaking Industries, Faslane in September of the same year. Two B1s are preserved, 61264 and 61306, now named ‘Mayflower’.
Photo from Bill Lynn collection

Royal Scot 4-6-0 No. 46115 'Scots Guardsman' photographed at the platform at Galashiels with a southbound train. The date is thought to be 17 July 1965 and the train is the 9.50am (SO) Edinburgh Waverley - Sheffield Midland, a relief to the up Waverley on summer Saturdays. Built in 1927 by North British Loco to a Fowler design, numbered 6115 and named 'Scots Guardsman'. This loco was rebuilt by Stanier with a taper boiler and renumbered by BR to 46115. Withdrawn from Carlisle Kingmoor on 1.1.1966, it was the last of the Scots to be withdrawn and was subsequently preserved.
Photo by Robin Barbour courtesy of Bruce McCartney from Railscot web site

Looking south at Galashiels station in the 1960s. A stack of mail bags is waiting on the down platform.
Photo by Robin Barbour courtesy of Bruce McCartney from Railscot web site

D1110 arrives at Galashiels on 13 April 1968 hauling the BR (Scottish Region) 'Easter Grand Tour'. The special ran Edinburgh - Stafford and return via separate circuitous routes.
Photo by Bruce McCartney from Railscot web site


After the track was lifted in 1971 Galashiels station was quickly demolished. Only some platform remnants under Station Brae bridge remained in 1975. This view is looking south.
P
hoto by Bill Roberton

The site of Galashiels station looking south in May 2011. A strip of land to the left has been retained for the new line to Tweedbank.
P
hoto by Nick Catford


Click here for more pictures of Galashiels station



Last updated: Thursday, 26-Nov-2015 09:53:59 CET
© 1998-2015Disused Stations