Station Name:SWITHLAND
Swithland Station was planned but never opened

[Source: Nick Catford]


Date opened: Not opened to passengers
Location: South side of Main Street
Company on opening: Great Central Railway
Date closed to passengers: Not opened to passengers
Date closed completely: 6.4.1964
Company on closing: British Railways (London Midland Region)
Present state:

Fully restored to original Edwardian condition. Grade II listed.

County: Leicestershire
OS Grid Ref: SK563133
Date of visit: Not visited

Notes: Although no station was ever opened at Swithland, this was the original site preferred by the Great Central over Rothley. There are also remnants of a later station here which was never completed. When plans were first announced for the main line station at Swithland, there were huge protests from Rothley that they were not to get one as well. Most of the objections were orchestrated by the then Lord of the Manor of Rothley, Frederick Merttens. In the end, the protesters prevailed and the station site was switched from Swithland to Rothley. Another reason for the change was probably that Lord Lanesborough of Swithland Hall would only grant permission to build on condition that he could 'flag down' any train he wished, which would then be obliged to stop for him!

The proposed Swithland station was later revived as a small halt for day trippers, during the construction of the Great Central the entrance and steps up to the station were built and tracks laid out before it was decided that with Rothley station less than a mile away, the plan was not viable.

The station site was later opened for freight traffic as Swithland Sidings, handling stone from Mountsorrel Quarry, a two mile mineral branch ran from the sidings to the quarry to the north west. The sidings closed on 6th April 1964.

In 1990 the sidings were wasteland but Swithland now forms the centrepiece of the double track preserved line, with GWR signalling as used on the GW&GC Joint Line, still being installed. A new signalbox has been brought to the sidings from Aylesbury and the site is used for storing various items of rolling stock. he GCR are hoping to reopen the mineral branch to the quarries and there are plans for a carriage shed on the branch but there are planning permission problems. Source: People making places web site.

BRIEF HISTORY OF THE GREAT CENTRAL RAILWAY BETWEEN SHEFFIELD AND LONDON
The Manchester, Sheffield and Lincolnshire Railway (MS & L) was formed in 1846 by the
amalgamation of the Sheffield, Ashton-under-Lyne and Manchester Railway with two proposed
lines - the Sheffield and Lincolnshire Junction Railway and the Great Grimsby and Sheffield
Junction Railway; the SA & M had opened between Manchester and Sheffield Bridgehouses in
1845. The Manchester, Sheffield and Lincolnshire Railway ran between Manchester London Road
(now Piccadilly) via Penistone to Sheffield (the Woodhead route) and on to Brigg, Grimsby and Cleethorpes. A second line left the main line at Penistone and served Barnsley, Doncaster and Scunthorpe before rejoining the Grimsby line at Barnetby. The MS & LR opened a line from Sheffield Bridgehouses to Beighton for passengers on the 12th February 1849. Passengers going south and to London changed on to the ‘Midland’ line at Eckington. On 15th September 1851 a new station called Sheffield Victoria was opened a short distance to the south west of the Bridgehouses terminus which was retained as a goods depot.

In 1854, Edward Watkin became General Manager and then in 1864 chairman of the Company. Watkin's ambition was to build a rail link between the industrial heartland of Manchester and Sheffield, south to London and through a tunnel beneath the channel to reach Paris and the expanding markets of Continental Europe.

In order to fulfil his ambitions, Watkin also became Chairman of the Metropolitan Railway who were in the process of extending their line northwards towards Rickmansworth and the South Eastern Railway connecting London with Dover. Initially, Watkin tried to convince other companies to build links with the MS & L allowing him to reach London but he was unable to reach agreement and eventually was left with little option than to build his own line southward from Sheffield to reach the Metropolitan.

In the 1890's the MS&LR began construction of its 'Derbyshire Lines', in effect the first part of its push southwards. Leaving its east - west main line at Beighton Junction, some 5 1/2 miles east of Sheffield, the line headed south through the Nottingham coal field with a branch line serving its new Central Station in Chesterfield. In July 1890 the MS&LR obtained another act to extend from Chesterfield to Heath creating a loop line. Work started on this new section, of some 4¾ miles, before construction on the original line was finished and opened in July 1893.

In 1893 the MS&LR obtained Parliamentary approval to extend this line to London (known as the ‘London Extension’. Construction of the 92 mile route started in 1895 and on 1st August 1897 the company changed its name to the Great Central Railway; it was the last 'main line' to be built until the Channel Tunnel rail link in 2003.

Due to its late construction, the company was able to take advantage of the latest technology including steam excavators. It was heavily engineered with viaducts and wide cuttings with a maximum gradient of 1 in 128; there were no sharp curves or level crossings which would ensure a fast service for both passengers and freight. Most of the stations on the ‘London extension’ were built to a standard design consisting of an island platform with the booking office located on the platform. All the stations were built on an embankment or in a cutting adjacent to a road bridge, with access via stairs from the middle of the bridge; only the larger intermediate stations like Rugby and Loughborough had street level buildings.  Because Edward Watkin also expected his trains to reach Europe through a channel tunnel, the line was also built to a larger continental (Berne) loading gauge. The Great Central opened for coal traffic on 25 July 1898, for passenger traffic to a new terminus at Marylebone on 15 March 1899 and for general goods traffic on 11 April 1899.

The new line was built from Annesley in Nottinghamshire to join the existing Metropolitan Railway which had now reached Quainton Road in Buckinghamshire, where the line became joint Met/GCR owned (after 1903), it returned to GCR metals near Finchley Road for the final section into Marylebone. In 1903, new rails were laid parallel to the Metropolitan Railway from Harrow to the junction north of Finchley Road, enabling more traffic to use Marylebone. Although the new line had now reached London, Edward Watkin was unable to fulfil his ambition as he was forced to retire through ill health.

From the outset, the line had to compete with established north – south routes and the first train only carried a disappointing four passengers so the company had to work hard to win passengers from its rivals; with  a well managed Advertising campaign and the introduction of a fast and efficient train service the companies fortunes slowly improved although it was never a match for its rival lines.

In the 1923 grouping, the Great Central became part of the London & North Eastern Railway which brought an increase in freight traffic from the south Midlands and south west England but the LNER's main north - south route was into London Kings Cross so the Great Central was always considered as a secondary route.

After nationalisation, the line became part of British Railways Eastern Region but was transferred to the London Midland Region in 1958. By this time the service was already in decline with the increasing popularity of the car and it was unable to compete with other north - south routes as the line passed through sparsely populated areas south of Rugby. Manchester to London express services were withdrawn on 2nd January 1960 leaving only three semi-fast trains a day and it came as little surprise when the line became the first main line to close in the Beeching era. Beeching considered that the Great Central was a duplicate route which could be sacrificed in favour of the Midland main line.

Many of the intermediate stations, including the Chesterfield loop closed on 4th March 1963 and long distance freight services were withdrawn shortly afterwards.  Annesley Motive Power Depot (between Nottingham and Sheffield) closed on 3rd January 1966 and Nottingham Victoria closed on 5th September 1966 along with the remaining stations south of Rugby. The track was lifted between Rugby and Calvert leaving a diesel multiple unit (DMU) shuttle service operating between Rugby and Arkwright Street and the southern section of the line between Aylesbury and London Marylebone which still carried considerable commuter traffic. The northern section of the line between Sheffield Victoria and Woodhouse also remained open as this also formed part of the Sheffield to Lincoln line. The line north of Nottingham remained in use until May 1968 serving the collieries at Annesley and Newstead and was eventually lifted in October/November 1969.

In 1968 the London Railway Preservation Society chose Quainton Road as its new base, the society being renamed as the Quainton Railway Society; this has now developed into the Buckinghamshire Railway Centre covering 25 acres. The Centre boasts one of the largest private railway collections in the country with numerous steam locomotives, many housed in the former listed trainshed from Oxford Rewley Road which was dismantled and rebuilt at Quainton Road in 1999/2000.

The shuttle service between Nottingham and Rugby lasted until 3rd May 1969. As closure approached a group of railway enthusiasts got together to discuss the possibility of buying a section of the track to operate preserved steam locomotives.  A steam service was reinstated between Loughborough and Quorn in 1973 and in 1976 Charnwood Borough Council agreed to purchase the land from BR and lease it to the railway for 99 years. Despite a shaky start, the Great Central Railway PLC are now operating throughout the year between their headquarters at Loughborough Central and a new station called Leicester North just inside the city boundary. The remaining track between Leicester - Rugby was lifted in early 1970.

North of Loughborough, the line remained open for freight traffic after closure to passengers in 1969 serving the gypsum mine at East Leake and the Ruddington Ordnance Storage and Disposal Depot south of Nottingham. This traffic ceased in the 1980's and the track north of Loughborough was mothballed by BR. In the early 1990's a group of transport enthusiasts set up the Great Central Railway (Nottingham) Ltd with the aim of redeveloping the derelict Ruddington Ordnance depot as part of a country park project. The depot was turned into the Nottingham Transport Heritage Centre (NTHC) and trains were run on a small length of line into the depot.

The NTHC's aim was to reinstate the remaining line into Loughborough where it joins the GCR
PLC thus forming a single 18 mile preserved line. In the 1990's NTHC obtained a loan to buy
the track from Railtrack. Gypsum traffic resumed in 2000 with up to two daily trains and revenue from British Gypsum is used to pay off the loan. Rushcliffe Halt has now been restored and in 2003 regular services were reinstated although passenger trains south of Rushcliffe Halt are limited to the second Sunday of each month as there is no station at Loughborough.

It is now both groups aim to reinstate two bridges, one over the Midland main line north of Loughborough, rebuild 300 yards of embankment and relay little more than a quarter of a mile of track. As well a 'bridging the gap' between the two preserved lines further long term proposals would see the line extended southwards to Leicester Abbey and northwards from Ruddington to join up with the Nottingham tram network and on to Nottingham city centre.

Sheffield Victoria closed on 5th January 1970 with the closure of the Woodhead route and trains from Lincoln were diverted into Sheffield Midland. Although the southern section of the main line remained open, it too was proposed for partial closure in 1986. Aylesbury was to remain open but all services would run into Paddington via Princes Risborough. Marylebone Station was due to close on 12th May 1986 but the station was eventually reprieved and the closure proposals were rescinded. Following rail privatisation in the 1990's, Chiltern Railways took over the route and in 2006 two new platforms were built at Marylebone on the site of the old daytime carriage sidings. The new platforms and partial resignalling of the station throat now make it possible to run 20 trains per hour in and out of the station.

North of Aylesbury the track remains in place but is only used by waste freight trains to the landfill site at Calvert where a junction with the Oxford - Cambridge line remains in use. On selected days, usually bank holidays, special passenger services run to the Buckinghamshire Railway Centre at Quainton Road station. There are now proposals to extend the passenger services northwards to a new station called Aylesbury Vale Parkway at the point where the line crosses the A41 near Berryfields Farm. This area is to be known as the Berryfields Major Development Area and will include park and ride facilities for Aylesbury.

With our motorway network now working at capacity there have been a number of proposals to reopen other sections of the Great Central main line and in 2006 Central Railway was formed to look into the feasibility of building a new rail link from central England to the Channel Tunnel which would include rebuilding part of the Great Central route south of Rugby reviving a 1990’s government proposal to reopen that section of the line as part of a fast rail link from Scotland to the Channel Tunnel.

Preservation group web sites: The Buckinghamshire Railway Centre, The Great Central Railway (steam service between Loughborough and Leicester North) & Nottingham Transport Heritage Centre (steam service between Ruddington and Loughborough)

Selected other web sites: The Transport Archive contains further detailed history of the Great Central plus a vast collection of 2344 'on line' photographs many ( the Newton Collection) taken during the construction of the London Extension. Chris Ward's Annesley Web site featuring numerous photographs of the Great Central around Nottingham and the Annesley Motive Power Depot. Great Central Railway through Leicester. Nigel Tout's web site with numerous photographs of the Great Central remains around Leicester and a series of archive photographs of the line. Bridging the Gap details ongoing work to reinstate the link between the two preserved lines. The Great Central Railway Society promotes an historical interest in the Great Central Railway.

Selected further reading: Great Central Memories by John MC Healey published 1987 by Baton Transport ISBN 0 85936 193 4 - heavily illustrated history of the London Extension. Great Central Then and Now by Mac Hawkins - published (2nd edition) by BCA 1992 ISBN 0 7153 9326 X , station by station photographic survey of the Great Central between Sheffield and London with numerous 'then and now' photographs. See also Sheepbridge & Brimington Station and construction of the Manchester, Sheffield and Lincolnshire Railway through Brimington by Philip Cousins. Published in St. Michael & All Saints, Brimington parish magazine. (Click here for full text). All tickets from Michael Stewart.

Too see other stations on the Great Central Railway between Sheffield Victoria and Aylesbury click on the station name: Aylesbury, Waddesdon, Quainton Road (1st site), Quainton Road (2nd site)**, Calvert, Finmere, Helmdon, Culworth, Woodford Halse, Charwelton, Braunston & Willoughby, Rugby Central, Lutterworth, Ashby Magna, Whetstone, Leicester Central, Leicester North***, Belgrave & Birstall, Rothley**, Quorn & Woodhouse**, Loughborough Central**, East Leake, Rushcliffe Halt**, Ruddington, Ruddington Factory Halt, Arkwright Street, Nottingham Victoria, Carrington, New Basford, Bulwell Common, Bulwell Hall Halt, Hucknall Central, Annesley South Junction Halt, Hollinwell & Annesley, Kirkby Bentinck, Tibshelf Town, Pilsley, Heath, Staveley Central, Renishaw Central, Killamarsh Central, Beighton (1st site), Beighton (2nd site), Woodhouse Junction, Woodhouse*, Darnall*, Sheffield Victoria & Sheffield Bridgehouses.
Chesterfield loop - Staveley Works, Brimington, Chesterfield Central & Grassmoor

* Station still open but included for completeness ** Station reopened by Great Central steam railway and Nottingham Transport Heritage Centre *** New station opened by Great Central steam railway
**** Station planned and partially built but not opened

The road bridge at Swithland in 1897. The station would have been to the right, the entrance arch is clearly visible below the bridge.
P
hoto by S W A Newton from Leicester & Rutland Record Office


Simulated map showing where the station would have been. The line to the right
goes to Mountsorrel Quarries


The completed entrance to Swithland Station in 1897
P
hoto by S W A Newton from Leicester & Rutland Record Office


The goods shed at Swithland Sidings in February 1978
Photo by R F Hartley
The site of the proposed Swithland Station in October 2005. The road bridge can be seen in the background and a widening of the track indicates where the platform would have been.
Photo by Jamie Steel from his Great Central Railway web site

February 1978

February 1978

Click on thumbnail to enlarge

 

 

 

[Source: Nick Catford]