Station Name: TOOTING JUNCTION

[Source: Nick Catford]

Date opened: 1.10.1868
Location: On the south side of Longley Road and west of the present Tooting Station.
Company on opening: London & South Western Railway and London Brighton & South Coast Railway Joint
Date closed to passengers: 12.8.1894
Date closed completely: 5.8.1968
Company on closing: London & South Western Railway and London Brighton & South Coast Railway Joint
Present state: Part of the main line platforms still survive but the station building has been demolished to make way for new housing. The brick facing on the down platform was removed in September 2016 to allow the tracks to be slewed over. The platforms on the Merton Abbey line were demolished many years ago. The station footbridge survives and now carries a public footpath across the track at the west end of the station.
County: London
OS Grid Ref: TQ277706
Date of visit: May 1968, January 1974, October 1976, December 1983 and November 2008.

Notes: Tooting or Tooting Junction Station (both names were used) had three platforms, one side 'up' platform on the north side of TM&WR loop line which also included the stationmaster's house and booking office, a second side 'down' platform on the Merton Abbey line and a large island platform with one face acting as the 'down' platform for the northern loop and another face acting as the 'up' platform for the southern loop. This platform was roughly triangular as the two lines diverged at this point and had a central awning at its east end. Tooting goods station was sited to the west of the station on the southern loop.

In 1894 the station was considered too small and was resited to the east side of Mitcham Road on 12th August that year. With the closure of the southern loop to passenger traffic in 1929 the junction was severed in 1934 and buffer stops installed 20 yards before the junction. The goods station remained open until 5th August 1968 operated as a long siding from Merton Park. After closure of the goods station the line was further cut back to a point just east of the Christchurch road bridge in Merton.

Since closure in 1894 the old station building at Tooting remained in use as the Tooting Stationmaster's house at least until c.1984 but by the end of that decade the building was empty and burnt out with many roof slates missing. It was however renovated by 1993 only to be demolished in July 2003 when a small housing estate was built on the site, the platform edge remains however. The goods shed was demolished at the same time, in later years it had been used as a brick showroom.

BRIEF HISTORY OF THE TOOTING MERTON & WIMBLEDON RAILWAY
The Tooting, Merton & Wimbledon Extension Railway obtained an Act on 19 July 1864. This was a nominally independent concern with powers to make working arrangements with both the LB&SCR and the LSWR but a further act of 1865 dissolved the independent company and vesting its line jointly in the LSWR and LBSCR. The Tooting, Merton & Wimbledon Railway opened on 1 October 1868 from Streatham Junction (on the LBSCR Peckham Rye to Sutton line dating from the same day) to Wimbledon, which was approached from two directions by lines diverging at Tooting Junction, one coming into the town from the north-east, the other from the south¬east after forming a junction with the Wimbledon & Croydon Railway at Merton. The northern arm of the loop line reached Wimbledon via a station at Hayden Lane.

The opening of the TMWR via Merton Abbey saw the doubling of the WCR between Wimbledon and the junction at Lower Merton. The line was double track throughout, the line through Merton being justified by promise of freight traffic from the copper mills at Merton Abbey where a siding was provided. At first only LBSCR trains used the TM&W, working
between London Bridge and Wimbledon by both routes to and from Tooting Junction, but the 1865 Act had given the LSWR running powers to Tulse Hill and on 1 January 1869 a Kingston to Ludgate Hill service was started, this utilised both arms of the TM & W. although most of the twelve daily trains between Kingston and Ludgate Hill ran via the Merton line.

There was two intermediate station on the Merton line at Merton Abbey and Lower Merton and one on the northern branch at Haydons Road, both opened with the line. Lower Merton was at the junction with the W & CR, initially there was only platforms on the Tooting line but a platform was later added on the Croydon line opening on 1st November 1870.

In 1893 of the 16 down trains between London Bridge and Tooting Junction, five continued to Wimbledon via Merton Abbey, returning via Haydon’s Road, the remainder reversing this route. Both routes were well used during rush hours but with the introductions of trams and motor buses after 1910 there was little off peak traffic.

Initially World War I brought few changes to passenger services until 31st December 1916 when services on both sides of the loop were withdrawn to make resources available for essential war transport. The passenger service resumed on 27 August 1923 at a reduced frequency. In 1929 the northern loop was electrified but following the opening of the Northern Line extension to Morden the southern loop had lost much of its traffic to the underground with commuters using Colliers Wood rather than Merton Abbey which closed from 3rd March 1929 when the loop was relegated to freight traffic only From the following day, electric trains ran half-hourly between Wimbledon and Holborn Viaduct seven days a week and the new electric trains quickly won back passengers from road transport.

The Merton Abbey chord remained busy with freight, but the junction at the Tooting end was severed on 10 March 1934, The up track was removed and the section was worked as a long siding from Merton Park, with control by telephone from instruments in the Merton Abbey goods office. Occasional special passenger workings visited Merton Abbey. In 1936 a
supplement to the working timetable indicated that the down platform could be used by excursion trains, but the line was not to be negotiated at more than 5mph, under the supervision of a pilotman.

In the late 1920s and 1930s, Merton saw industrial expansion and a siding was laid from the Merton Abbey track into the new Lines Brothers Triang toy factory in Morden Road. Other private sidings served the Eyre Smelting Works and the New Merton Board Mills at Merton Abbey. As late as 1960 there were still two return goods workings daily from Norwood to Merton Abbey and one on Saturdays to Hackbridge, but with factory closures and increased use of road transport, loadings fell, and after the last revenue train ran coal down to Merton Abbey on 1 May 1975 the track was quickly lifted.

The section of the TM & WR route east of Morden Road was used to construct Merantun Way (A24) in the early 1990's. The road was built to relieve traffic congestion on Merton High Street and was originally planned to continue to the west, along the route of the old railway to Kingston Road, with a flyover across Morden Road. This section of the route was never constructed although the space between the carriageways where Merantun Road meets Morden Road provides the space for a flyover bridge to be constructed. The track bed between Morden Road and Merton Park Station is now a public footpath and nature reserve

Tickets from Michael Stewart, Bradshaw from Chris Hind. The tickets above are not from the original Tooting Junction station but from the later replacement. The Bradshaw also refers to the later station.

Sources:

Click on station name for other stations on the Wimbledon - West Croydon line: Merton Park, Morden Road, Mitcham, Mitcham Junction, Beddington Lane, Waddon Marsh & West Croydon

See also the Tooting Merton & Wimbledon Railway: Merton Abbey, Tooting Junction and Haydons Road.

See also the St. Helier Estate Railway
(West Croydon, Mitcham Junction and Haydons Road are still open but are included for completeness)


Tooting Junction Station looking east in c.1910, 16 years after closure. The replacement station can be seen on the far side of the bridge. The main station building seen on the left remained unaltered for more than 90 years after this picture was taken.



1895 1: 1560 OS map shown both the old station and its replacement on the east side of Mitcham Road. Although published in 1895 the survey was probably made in 1893 when the station was still open. The station building is seen at the east end of the up main line platform with an open shelter in the form of a canopy on the island platform. A coal depot is seen on the down side of the Merton Park line. An access road to the goods yards runs from Mitcham Road to Finborough Road. There is a small goods shed behind the down platform backing on to this road. Click here for a larger version.

1934 1: 2,500 OS map. The station is now closed. The goods yard has been relaid with an new rail served warehouse to the west of the coal yard. The goods yard can now only be accessed from Mitcham Road. There has been some residential development between the two lines. Click here for a larger version.

Tooting Junction Station looking west in 1959
Photo by David Bradley from David Bradley Online web site


Tooting Junction Station looking east in 1959
Photo by David Bradley from David Bradley Online web site



Tooting goods yard in 1967. At this time the goods station handled very little traffic and closed the following year. Note the large rail served warehouse which was, by this time, occupied by T Sims and Co. The much smaller goods shed is seen in the distance.
Photo by Ian Baker

Tooting Junction station looking west in 1968
Photo by Nick Catford


Tooting Junction station looking east in May 1968
Photo by Nick Catford

Looking east towards Tooting Junction station in the early 1970's. Tooting goods yard can be seen in the middle distance. The goods yard closed on 5th August 1968 but a coal merchant appears to be still trading.
Photo by Roger Tiller


Tooting Junction station in May 1974 seen from Mitcham Road bridge. The goods shed was still standing at this time.
Photo by Nick Catford


Tooting Junction stationmaster's house and booking office was in poor condition in c.1980.
Photo by Charlie Pottins

Tooting Junction station looking west in December 1983. The station building has now been repaired and is in private occupation.
Photo by Nick Catford


Tooting Junction station looking east in November 2003. The down platform face is intact as is half of the up platform face. The new housing development has been built on the platform following demolition of the station building.
Photo by Nick Catford

The brick facing of the surviving down platform being demolished in September 2016. A steel and timber retaining wall is being built to the rear. This will allow the tracks to be slewed over to accommodate new Thameslink Class 700 EMUs.
Photo by Nick Catford

Click here for more pictures of Tooting Junction Station



 

 

 

[Source: Nick Catford]



Last updated: Friday, 26-May-2017 08:57:08 CEST
© 1998-2008 Disused Stations