Station Name: COLLINGHAM BRIDGE

[Source: Nick Catford]


Date opened: 1 May 1876
Location: Between Linton Road and Beck Lane. Dewar Close occupies the site of the goods yard.
Company on opening: North Eastern Railway
Date closed to passengers: 6 January 1964
Date closed completely: 6 January 1964
Company on closing: British Railways (North Eastern Region)
Present state: Demolished - no evidence of the station apart from two railway cottages.
County: Yorkshire
OS Grid Ref: SE385461
Date of visit: 7 September 2008

Notes: Collingham Bridge station served the villages of Collingham and Linton to the south of Wetherby. It was named 'Collingham Bridge' to avoid confusion with Collingham station in Nottinghamshire. Under an Agreement of 29 December 1871 any train could be asked to stop at the station at the request of Lord Leconfield. King Edward VII and Queen Alexandra travelled by Royal Train to Collingham Bridge station in 1909.

As built, the station had a single platform with the building on the up side of the line. This was a substantial structure of a type which is still found at Garforth, about seven miles south, and was similar to a number of other stations scattered around the former NER system.  The long office range ended with a single-storey cross-wing; its gable-end on the platform elevation was embellished by frilly bargeboards and it had a bay window with its own gable, with bargeboards to match those of the gable-end. At the opposite, north-eastern, end of the office range was the two-storey station house, projecting on the platform elevation. A verandah supported by two plain columns stretched between the station house and the single-storey cross-wing.

There were sidings on both sides of the line controlled by a signal box at the south-west end of the platform. The main goods yard, which was entered from the south, was on the up side with a siding and a loop running over coal drops behind the platform. Two further sidings ran diagonally across the yard; the shorter siding served a cattle dock and pens while the longer parallel siding passed through a brick-built goods shed. There was also a two-ton capacity yard crane. There was an additional siding entered from the north on the down side, opposite the platform. This was regularly used to stable race specials waiting to return to pick up passengers at Wetherby at the end of the day.

The line from Cross Gates was doubled in 1901 and a second platform with a standard NER design timber pent-roofed waiting room was provided. A lattice footbridge at the north-east end of the station, not of the standard NER design, spanned the two platforms and the siding to the north of the station to provide additional access from Linton Road, avoiding a long walk round to the bridge on Harewood Road. At this time a new signal box was built at the north-west end of the station on the down side.  It was sited between the down line and the re-located down siding which now became a loop rejoining the down line close to the bridge. An additional siding was also added along the south boundary of the goods yard, running behind the goods shed.

In 1911 the station had a catchment area with a population of 1,137. In that year 18,156 tickets were sold, and the main freight handled was timber with 586 tons, barley, with 464 tons and potatoes, with 407 tons being dispatched, whilst 92 wagons of livestock were loaded at the station. The station closed to passenger and goods traffic from 6 January 1964. BR had invested little in the facilities, and at closure the station retained oil lanterns of NER vintage and LNER running-in nameboards, albeit re-painted in BR North Eastern Region tangerine. The station and goods yard were cleared for new housing in the early 1970s.

BRIEF HISTORY OF THE CHURCH FENTON - HARROGATE RAILWAY & THE CROSS GARES TO WETHERBY RAILWAY
Notes: Harrogate was known as 'The English Spa' in the Georgian era, after its mineral-rich waters were discovered in the sixteenth century. In the seventeenth and eighteenth centuries the chalybeate waters (containing iron) were a popular health treatment, and the influx of wealthy, but sickly, visitors contributed significantly to the wealth of the town.

With the country in the grip of 'railway mania' in the 1840s Harrogate was an obvious target for railway entrepreneurs who were eager to cash in on the town’s popularity, with its wealthy clientele able to pay high fares.  In Harrogate local townsfolk and businesses initially opposed the railway, fearing that an influx of people from Leeds and Bradford would lower the tone of the area; but this opposition was overcome. It was going to be a race to see who would be first to reach the town.
 
The Great North of England Railway (GNER) made the first proposal. Having opened their main line between York and Darlington in 1841 they proposed a branch from Pilmoor, 16 miles north of York, to Harrogate via Boroughbridge and Ripon.


The York & North Midland Railway (Y&NMR) opened in 1839, connecting York with the Leeds & Selby Railway and, in 1840, with the North Midland Railway at Normanton near Leeds. The line was largely financed by ‘Railway King’ George Hudson who invested a substantial inheritance in the North Midland, becoming a director. He then took an active part in the promotion of the route and commissioned George Stephenson to construct the line. Having completed the York line, George Hudson then turned his attention to Harrogate, proposing a branch to the town from a junction with the Y & NM at Church Fenton, ten miles south of York.

The final player was the Leeds & Thirsk Railway (L &TR) who had an ambitious scheme for a new main line linking the industrial regions around Leeds with the north-east. George Hudson had an interest in this scheme as well.

George Hudson was clearly keen to increase the size of his empire, and by 1845 he had taken a lease on the GNER, and he immediately withdrew the Pilmoor - Harrogate proposal to leave the way clear for the two other routes.

The Y&NMR obtained their Act for the Church Fenton - Harrogate line in 1845, and the eighteen-mile route was staked out in September of that year. It was opened in two stages, with the first 13-mile section between Church Fenton and a temporary terminus at Spofforth opening on 10 August 1847. There were intermediate stations at Stutton, Tadcaster, Newton being conveyed the last five miles into Harrogate by horse-drawn omnibus. The only engineering feature of note was a two-span iron girder bridge over the River Wharfe between Newton Kyme and Thorp Arch.

The shorter five-mile section between Spofforth and Harrogate took a further year to complete owing to much more difficult terrain, with a gradient of 1 in 36 taking the line up to the unusually narrow 825yd Prospect Tunnel in which trains were not permitted to pass; then 300yd from the tunnel portal, the line crossed the 624yd, 31-arch, Crimple Viaduct which towered 110ft above the valley floor at its highest point.  Beyond the viaduct the line went through the 400yd Brunswick Tunnel before entering the terminus at Harrogate Brunswick. (This was the official name of the station, although in timetables it was shown only as Harrogate). The extension to Harrogate opened, without prior announcement or ceremony, on 20 July 1848. 

The initial service was five trains per day in each direction with no trains on Sunday. Within two years this had been reduced to three trains each day, probably owing to the opening of the Leeds & Thirsk Railway just five weeks later on 1 September 1848; their station was 1¾ miles to the east at Starbeck.  When completed in July 1849, this line provided a more direct route to Leeds without the need to change at Church Fenton.  The L&TR had planned to extend their line into Harrogate, but this had to be shelved because of the higher than expected cost of completing their line between Leeds and Starbeck.

In an attempt to prevent competitors from encroaching on its territory, a direct Leeds to York railway was promoted by George Hudson through the Y&NMR. The construction of the line was authorised in 1846 and was to run from Copmanthorpe on the outskirts of York to Cross Gates, several miles east of Leeds, joining the Church Fenton to Harrogate line between Tadcaster and Stutton.

In 1849 George Hudson was forced to resign as chairman of the York & North Midland Railway following his involvement in dubious business activities. The collapse of railway investment in 1849 resulted in the abandonment of the project, but a ten-arch stone viaduct over the River Wharfe at Tadcaster had already been constructed. The need for the line evaporated with the opening of the Micklethorpe to Church Fenton line in 1869 although the viaduct did eventually see rail traffic in the form of a siding serving a flour mill on the east side of the river. The siding closed in 1955. The viaduct is Grade II listed and is owned by Tadcaster Town Council; it now carries a public footpath and cycleway.

The L&TR was renamed the Leeds Northern Railway in 1851, and it was joined by the East and West Yorkshire Junction Railway from York at Knaresborough, east of Harrogate. In 1854 the York & North Midland Railway amalgamated with the Leeds Northern Railway and the York, Newcastle & Berwick Railway to form the North Eastern Railway (NER) which brought control of all the railways in the region under one company.  The fledgling NER was quick to improve the railway layout around Harrogate.

The NER built a spur from the former L&TR line at Pannal to join the Y & NMR line west of Prospect Tunnel. Just short of Brunswick Tunnel another new line was built to join the line from Starbeck enabling trains to run into a new central station which opened on 1 August 1862. Brunswick station was closed; initially it was retained for goods traffic, but this was short-lived.  By 1880 the service between Harrogate and Church Fenton was restored to five trains per day. 

The North Eastern Railway soon had plans for other new lines in the region. One of the most ambitious was for a direct route between Leeds and Scarborough by-passing York.  For much of its route it would utilise existing lines, but it included new construction from Cross Gates to a junction with the Church Fenton - Harrogate line at Wetherby. On 5 May 1866 The York Herald reported that the Leeds - Wetherby Railway Bill had been put before the Select Committee of the House of Commons for a single line to run from the Leeds and Selby branch, near Cross Gates, to the Church Fenton and Harrogate Branch at Wetherby - a length of 10 miles 66 chains. New capital to be raised was £210,000, with borrowing power of £70,000. The work was to be completed in five years, under penalty. Tenders for the project were invited in November 1871 and seven firms responded with bids.

The Leeds to Scarborough line was eventually abandoned owing to the economic downturn, although some sections were completed including the Cross Gates - Wetherby line which opened on 1 May 1876 with intermediate stations at Scholes, Thorner, Bardsey and Collingham Bridge.  The junction at Wetherby faced Church Fenton so it was not possible to run trains into Harrogate. This was rectified in 1901 when the line was doubled and a new curve facing Harrogate was built at Wetherby.

Cross Gates - Harrogate now became an important alternative route to the L&TR which was used increasingly by goods traffic and by the recently introduced Liverpool to Newcastle passenger expresses, which we now able to avoid a reversal at Leeds. As this route by-passed Wetherby station, which was sited to the east of the town, a new Wetherby station opened on 1 July 1902 at the south end of the new triangular junction, with the old station being retained for goods.

In 1902 the Great Northern Railway started running express services from Kings Cross to Harrogate via the Church Fenton to Harrogate line, with three daily trains in each direction. These continued after the grouping in 1923 and included the prestigious 'Harrogate Pullman'.  Although the Cross Gates to Harrogate line was always considered the major route, the August 1906 timetable shows a good service on both lines with a mixture of stopping and express services. Express trains from London over the Church Fenton - Wetherby line had stopped running by 1947. 

Wetherby racecourse opened in 1891, and an untimetabed station was opened c1924 to serve it.  This was last used on 18 May 1959, but racecourse specials continued to run to Wetherby station from Bradford Exchange on race days until 1963. A new station called Penda's Way, between Scholes and Cross Gates, was opened on 5 June 1939 to serve the growing residential development in that area.

In March 1940, additional traffic came to the Church Fenton to Wetherby line when a Royal Ordnance Factory was opened at Thorp Arch just to the north of the station. It was constructed for the Ministry of Supply and built on a 450 acre site. It took 18 months to build and cost £5.9 million. Thorp Arch was considered to be an ideal site, away from the large centres of population, possessing a reliable water supply, good rail links and proximity to the A1 trunk road. Workers were brought in from Leeds, Selby, York and all surrounding areas. 10,000 people, mainly women, were employed there at the height of production, and it is believed to have had 619 buildings. In World War II it produced light and medium gun ammunition, heavy ammunition, mines and trench mortar ammunition for the Army; medium and large bombs for the RAF; and 20mm and other small arms ammunition for all three services.

It was linked to the London & North Eastern Railway, which was used in its construction, for supplying raw materials and for transporting away filled munitions. The factory was served by a 6½-mile single-track circular railway with four platforms for munitions workers: these were named River, Ranges, Roman Road and Walton. Special workmen's trains ran from Leeds and Bradford Exchange and from as far afield as Hull and Doncaster on Monday to Saturday calling at the four halts. The last passenger traffic was in 1957 when the five unadvertised trains were withdrawn.

ROF Thorpe Arch closed twice: once after World War II and then finally after the Korean War in April 1958. Once production had halted, the site was gradually de-contaminated. In the early 1960s George Moore, a local businessman, bought most of the site and the development of the area as a trading estate began. The estate was later owned by Thorp Arch Limited Partnership, but is now known as Thorp Arch Estate and is owned by the trustees of Hanover Property Unit Trust. It comprises an area of over 100 businesses, including the Thorp Arch Retail Park. The most notable addition to the estate is the Northern Reading Room, Northern Listening Service and Document Supply Centre of the British Library, occupying what was the locomotive shed and engineering department. Another part is a prison, originally HMP Thorp Arch, now HMP Wealstun.

Whereas the route between Cross Gates and Harrogate maintained a reasonably frequent weekday service the train frequency via Tadcaster was drastically reduced after WWII. The winter 1937-8 LNER timetable showed 7 trains from Church Fenton to Leeds via Tadcaster on Monday to Friday in each direction, whilst there were twice as many between Leeds, Wetherby and Harrogate. No trains ran on Sunday. The first British Railways (North Eastern Region) timetable of summer 1948 had only three Monday-Friday trains via Tadcaster, but five on Saturday.  In summer 1950 only three trains to Leeds and two to Church Fenton were shown. By 1961 there was only one local morning train between Church Fenton and Leeds via Wetherby, and another, also in the morning, from Leeds to Tadcaster, which ran only as far as Thorp Arch on Saturday. No passenger service was shown from Tadcaster to Church Fenton. By 1963 only the 7.44 am departure from Church Fenton to Leeds was shown in the public timetable, the train actually having run from Leeds via Garforth. It is likely that its principal role was to carry parcels. In 1961 there were four trains between Harrogate and Leeds in each direction, with two additional trains between Wetherby and Leeds and one in the opposite direction. Long distance traffic between Leeds and Newcastle had continued to use the line, but this ended with the completion of the quadrupling of the East Coast main line in 1959. The earlier twenty freight trains between Harrogate and Wetherby (in each direction) had fallen to five by 1960.


In 1961 the recently introduced diesel service between Liverpool and Newcastle was switched from the Arthington route bringing new traffic to the Wetherby line. Although this route was slower it avoided a reversal at Leeds.  This renewed importance could not however save the lines. At the time of the Beeching enquiry, there was a maximum of eight passengers on the one train a day between Church Fenton and Leeds via Wetherby, with no regular passengers. There were a few more passengers on the Leeds to Wetherby route but competition from an improving bus service eventually made passenger numbers unsustainable despite the increase in the number of commuters living in Wetherby. Stations had received minimal investment since Nationalisation, amounting to little more than painting the nameboards in BR(NE) tangerine and installing totem name signs at Wetherby.

Given that all stations were manned, together with sixteen signal boxes and three manually
operated level crossings (requiring 35 staff in total), and the number of steep gradients requiring the use of banking engines, it is of little surprise that it was considered uneconomical. At Wetherby station alone, 14 staff were employed attending to the needs of only 30 passengers per day. The economics of the Wetherby lines were, in fact, worse than the cautionary examples given in Beeching's report. It had a yearly operating cost of £57,000 compared to receipts of £9,000, though some argue that the Wetherby to Leeds route could have been made profitable with some adjustments. Local freight now consisted largely of house coal, the use of which was declining.

A notable headline at the time read 'First lamb to the Beeching slaughter', cheerfully further stating 'No regular passengers object at inquiry’, which was the case, but only for the Wetherby - Church Fenton line. It was also inaccurate in that the Newcastle – Washington service, earmarked by Beeching, had closed the previous September!  A decision was reached on 24 October 1963, the inquiry having taken just three months, with both lines closing to passengers from  6 January 1964. The original Wetherby station remained open for goods traffic until 4 April 1966.  The only section of the original route to remain open is the short section of line from the Crimple Viaduct (where the spur from Pannal joined the Church Fenton route to the junction with the line to the former Brunswick terminus. This section is used today by the frequent Leeds – Harrogate – Knaresborough – York services. A new station called Hornbeam Park opened just south of this junction on 24 August 1992.

In the late 1960s, it was evident that Wetherby was going to grow. In 1965 it was estimated that by 1981 the town's population would double to 12,000 and this estimate proved quite accurate. There were ambitious plans to relieve growing congestion through the town centre and on the A58 and A661 by converting the disused railways into relief roads. These suggestions never came to fruition. In Railways around Harrogate, Volume 3 (1998) Martin Bairstow presents a compelling case, headed ‘A lost commuter route?’ for the restoration of passenger services between Leeds and Wetherby. He also remarks that the dieselisation of the service in January 1959 could have increased the use of the trains, but without improved frequency of trains that some neighbouring lines enjoyed, there was really no incentive to use them.

The track was lifted in 1966. Some parts of the former railway tracks between Wetherby and Leeds have been used for housing development at Bardsey and Collingham Bridge. Sustrans National Cycle Network routes 66 and 67 use some of the remaining trackbed. This line is walkable from Cross Gates to a point south of Collingham where a landowner refuses access to a short section of the line. At Scholes muddy conditions are encountered, but this soon gives way to a grassy embankment with lots of sandstone bridges in situ. The most impressive stretch is just north of Thorner where the line passes through a very deep, narrow cutting with the Seacroft road soaring above on a high brick bridge. At Collingham the road bridge must be used to cross the Wharfe, but from the north bank a footpath follows the embankment, sandwiched between a golf course and the river, into Wetherby. A public footpath and cycleway follows the trackbed from the A1 (M) to Thorp Arch station and from Wetherby to Stofforth - this section of the path is known as Harland Way..

Tickets from Michael Stewart. Bradshaws from Chris Totty. Route map drawn by Alan Young.

Thanks to Martin Bairstow (author/publisher), Peter Tuffrey (author) and the Wetherby Historical Trust who supplied many of the photos used in this feature.

Sources:

To see other stations on the Harrogate - Church Fenton line
click on the station name:
Harrogate Brunswick, Hornbeam Park, Crimple, Spofforth, Wetherby (1st site), Wetherby Racecourse, Thorp Arch, Newton Kyme, Tadcaster,
Stutton & Church Fenton
See also River Platform, Ranges Platform, Roman Road Platform &
Walton Platform on the ROF Thorp Arch Militery Railway.
Special feature: Royal Ordnance Factory 8 - Thorp Arch

To see stations on the Cross Gates - Wetherby line click on the station name: Cross Gates, Penda's Way, Scholes, Thorner, Bardsey and Wetherby (2nd site)


Collingham Bridge station looking north-east from the down platform c1905, four years after the line was doubled. The footbridge also spans a siding - out of view behind the down platform - to provide an alternative way onto the station from Linton Road, avoiding a walk to the bridge on Harewood Road. The station served the villages of Collingham and Linton.
Copyright photo from John Alsop collection


1893 1:2,500 OS map shows the original layout of the station before the line was doubled in 1901. The signal box is at the south-west end of the platform.

1938 1:2,500 OS map shows the layout of the station after the line was doubled in 1901. A second platform has been provided on the site of an earlier siding which has been re-laid behind the platform and changed to a passing loop. An additional siding has been added on the south side of the goods yard. A new signal box has been provided at the north-east end of the down platform. There has been much residential development to the north of the station, and passengers are able to use the footbridge from Linton Road to reach the station.

Looking north-east towards Collingham Bridge station from Harewood Road bridge. The layout of the goods yard is clearly seen. There is a loop siding behind the down platform with the main goods yard on the up siding. The coal drops are behind the wall at the back of the up platform. Three other sidings fan out across the yard: the first serves a cattle dock and pens - the wagon is standing at the dock; the second passes through the goods shed which is seen on the right; and the third follows the southern boundary of the yard, passing to the south of the goods shed.
Copyright photo from John Alsop collection

A Leeds passenger train has just left Collingham Bridge station in 1933. No.267 entered NER service in February 1890. Built at Darlington works to a design by Worsdell, it was classified N8 and renumbered to 9395 by the LNER in 1946 and to 69395 by BR. With a working life of 62½ years it was withdrawn in August 1952 and scrapped shortly after. It is clear in this picture that the siding serving the coal drops is at a higher level, allowing the coal to be dropped into the bins below.
Copyright photo from John Alsop collection

Carrying class A, express passenger, headlamps 64863, a Gresley-designed J39, 0-6-0, passes through Collingham Bridge station towards Leeds in 1956. Built at the LNER Darlington works it entered service on 13 November 1935 at Sunderland shed and lasted until 31 January 1965 when it was withdrawn from 50B, Neville Hill shed, to be cut up in December 1962.
Photo by Mike Mitchell

An afternoon Harrogate - Leeds service is seen at Collingham Bridge station in August 1957. 62727 was built in 1929 to the Gresley D49, 'Hunt' class. Named 'The Quorn' , after the hunt of the same name, it entered service on 1 June and had a working life of well over 31 years, when it was withdrawn from 53A, Hull Dairycoates shed on 16 January 1961 and cut up that April. The high wall at the back of the platform hides the coal drops.
Photo by Mike Mitchell

A busy day at Collingham Bridge station on Easter Monday 1957 with passenger coaches being shunted into two sidings. This was a race day at Wetherby, and the trains are waiting at Collingham Bridge until required for the return journeys after the races.
Photo by Mike Mitchell

A Leeds-bound passenger train prepares to depart from Collingham Bridge station in 1959. No.62738 was built at Darlington works of the LNER and entered service on 3 May 1932. This Gresley-designed 4-4-0 J49 was named 'The Zetland' after the hunt of the same name; indeed all 41 locos in the class were named after hunts, thus the class became known as 'Hunts'. With a service life of over 27 years, 62738 was withdrawn on 21 September 1959 from 50A, York North shed, and was cut up at
Darlington that October.
Photo by Mike Mitchell

A northbound DMU has just left Collingham Bridge station in November 1963. Although local services were dieselised in 1959 steam traction was still regularly seen on some express services and freights.
Photo from Wetherby Historical Trust from Matt Higgins Flickr photostream

A permanent way tamper stands in the up platform at Collingham Bridge station in 1964, some months after closure. The rails are very rusty and clearly have not seen any traffic for some time.
Photo by John Ford, from the David Ford collection

Collingham Bridge station forecourt in February 1965, a year after closure.
Photo from Wetherby Historical Trust from Matt Higgins Flickr photostream

Collingham Bridge station building in January 1971. The building is empty and was probably demolished shortly after this picture was taken.
Photo by John Mann

The site of Collingham Bridge station looking south-west in September 2010. The line of trees is also seen in the 1965 picture above.
Photo by Nick Catford

Click here for more pictures of Collingham Bridge station

 

 

 

[Source: Nick Catford]


Home Page
Last updated: Wednesday, 17-May-2017 09:16:38 CEST
© 1998-2013 Disused Stations