Station Name: THORP ARCH

[Source: Nick Catford]

Date opened: 10 August 1847
Location: North side of Church Causeway
Company on opening: York & North Midland Railway
Date closed to passengers: 6 January 1964
Date closed completely: 10 August 1964
Company on closing: British Railways (North Eastern Region)
Present state:

The station is in private residential use and is exceptionally well preserved. Externally it is largely unaltered although an upper floor has been added to the north end of the central section of the station building, and some pointed-arch windows in the former station house have been replaced with rectangular ones. The up platform has been demolished and now forms part of the lawn for the house. The north end of the down platform has also been demolished. The goods shed is extant, complete with a 2 x 2-bay canopy supported on iron pillars at its south end. There are three arched openings under the canopy at its south end and, at the north end, two openings and a small out-building. The siding ran though the east side of the shed. The remains of the coal drops can also still be seen.

County: Yorkshire
OS Grid Ref: SE438466
Date of visit: 7 September 2010 & 16 April 2013

Notes: Thorp Arch station served the villages of Thorp Arch and Boston Spa. Boston Spa is on the west bank of the River Wharfe. In 1744 John Shires established Boston as a spa town when he discovered Magnesian Limestone and sulphur springs. In those days it was known as Thorp Spa. It declined when neighbouring Harrogate became very popular as a spa town. In 1753 the Tadcaster to Otley road, which runs through Boston Spa, was turnpiked. In the same year Joseph Taite built a house for the accommodation of visitors in Boston Spa; it became the ‘Royal Hotel’ and is still standing, but converted into flats and shops. By 1819 Boston Spa had a population of over 600, and there were several inns and other houses offering accommodation. Spa baths were built to allow visitors to take the waters. On the east bank of the river lay the small estate village of Thorp Arch, which predates Boston Spa by several centuries

The station had two facing platforms on the north side of a level crossing. The main station building was on the down side with a standard NER timber waiting room with a sloping rood on the up side. George Townsend Andrews designed the very attractive station in 1847. The large size and excellent quality of the station serving a very small village was due to the proximity of Boston Spa across the river Wharfe. The station was actually called Thorp Arch (Boston Spa) for most of its life. 

The office range and waiting rooms were in a single-storey building of a strongly Tudor-Gothic style, with paired and tripartite lancet window openings and similar arched doorways; it is of cream-coloured Tadcaster Limestone with sandstone copings and chimneys and a steep gabled roof. At the northern end is the complementary stationmaster’s house, a two-storey L-shaped structure, with a canted bay window – a distinctive feature of Andrews’ designs – permitting the stationmaster a view of the platforms from his sitting room. On the platform elevation the roof is carried forward between the projecting gables of the station house at the north end and the cross-wing containing the booking office at the south end, to form a verandah in which passengers could shelter. The beam on which the verandah roof rests is supported by three octagonal columns with cusped brackets springing from the building. At the southern end of the office range, and providing a dignified, almost ecclesiastical, entrance for the former passengers is a Gothic loggia, with buttressed pointed arches beneath the extended roof of the cross-wing. Fawcett (2011) intimates that in later years passengers used this loggia as a ‘booking lobby’, whereas the booking office originally occupied a smaller space and a small booking hall adjoined the loggia entrance. From south to north the facilities in the station building were the booking lobby and office; second, then first class waiting rooms; ladies’ waiting room and lavatory; and finally a urinal and yard with a coalhouse behind.The building resembles that at the first Wetherby station.

The goods yard is to the north of the station on the down side. Facilities included a loop allowing access from both directions. A cattle dock was sited alongside the loop. A short siding, running off the loop to the south, ran through a large goods shed with a hipped Welsh-slate roof and a wide canopy supported on cast iron pillars at the south end. The goods shed was also designed by Andrews and is very similar to the shed at Wetherby. A further siding off the loop served an end-dock with another pair of sidings running over coal drops. There was also a one-ton capacity crane in the yard. A signal box beyond the level crossing, on the up side, controlled the crossing and access to the goods yard.

In 1911 the station had a catchment area with a population of 3,303. 20,610 tickets were sold that year, and the main freight handled was barley, with 186 tons and potatoes with 111 tons being dispatched, but only two wagons of livestock were loaded at the station.

In February 1940 construction of the Thorp Arch Royal Ordnance Factory started. It was located on the banks of the River Wharfe, north-east of the villages of Boston Spa and Thorp Arch. One reason for choosing the site was its proximity to the London & North Eastern Railway line, which would be used during the construction and, later, for bringing in raw materials and for transporting away filled munitions. Initially all construction material that came by rail had to be unloaded at Thorp Arch station goods yard, but on 24 June the LNER laid in a connection to sidings closer to the factory.

The influx of construction workers strained the facilities of the station to the limit, with many workers climbing aboard the crowded trains from the track. In June 1941 the platforms were extended to accommodate the long workmen's trains. It was soon clear that better arrangements were required with large numbers of workmen commuting each day

Once the factory was in production, the expected workforce of 18,000 would be arriving by train. As they had to be transported to various locations in the factory the LNER built a circular railway around the perimeter with four stations. This line joined the public railway at two points south of Thorp Arch station. The station signal box became Thorp Arch West and now also controlled access to the factory line. The second junction, 800 yd to the south, was controlled by the new Thorp Arch East box. Between the two boxes was a network of carriage and exchange sidings. ROF Thorp Arch closed in April 1958. The 1956 Handbook of Stations states that the Thorp Arch goods yard could handle all classes of freight. The station became Thorp Arch on 12 June 1961 when the Boston Spa suffix was dropped. It closed to passengers on J January 1964 but the goods yard remained open for a further seven months, closing on 10 August 1964.

The 1956 handbook of stations states that the Thorp Arch goods yard could handle all classes of freight. The station became Thorp Arch on 12 June 1961 when the Boston Spa suffix was dropped. It closed to passengers on J January 1964 but the goods yard remained open for a further seven months closing on 10 August 1964.

Biddle (2003) opines that ‘few station buildings that have been closed for so long have managed to retain their original characteristics so perfectly as Thorp Arch’; it is assuredly the best preserved station on the lines around Wetherby. Both the station building and goods shed are in good order, with few external alterations, and were both Grade II listed in February 1988. A public footpath and cycleway that runs along the trackbed through Thorp Arch bypasses the station to the south.

BRIEF HISTORY OF THE CHURCH FENTON - HARROGATE RAILWAY & THE CROSS GARES TO WETHERBY RAILWAY
Notes: Harrogate was known as 'The English Spa' in the Georgian era, after its mineral-rich waters were discovered in the sixteenth century. In the seventeenth and eighteenth centuries the chalybeate waters (containing iron) were a popular health treatment, and the influx of wealthy, but sickly, visitors contributed significantly to the wealth of the town.

With the country in the grip of 'railway mania' in the 1840s Harrogate was an obvious target for railway entrepreneurs who were eager to cash in on the town’s popularity, with its wealthy clientele able to pay high fares.  In Harrogate local townsfolk and businesses initially opposed the railway, fearing that an influx of people from Leeds and Bradford would lower the tone of the area; but this opposition was overcome. It was going to be a race to see who would be first to reach the town.
 
The Great North of England Railway (GNER) made the first proposal. Having opened their main line between York and Darlington in 1841 they proposed a branch from Pilmoor, 16 miles north of York, to Harrogate via Boroughbridge and Ripon.

The York & North Midland Railway (Y&NMR) opened in 1839, connecting York with the Leeds & Selby Railway and, in 1840, with the North Midland Railway at Normanton near Leeds. The line was largely financed by ‘Railway King’ George Hudson who invested a substantial inheritance in the North Midland, becoming a director. He then took an active part in the promotion of the route and commissioned George Stephenson to construct the line. Having completed the York line, George Hudson then turned his attention to Harrogate, proposing a branch to the town from a junction with the Y & NM at Church Fenton, ten miles south of York.

The final player was the Leeds & Thirsk Railway (L &TR) who had an ambitious scheme for a new main line linking the industrial regions around Leeds with the north-east. George Hudson had an interest in this scheme as well.

George Hudson was clearly keen to increase the size of his empire, and by 1845 he had taken a lease on the GNER, and he immediately withdrew the Pilmoor - Harrogate proposal to leave the way clear for the two other routes.

The Y&NMR obtained their Act for the Church Fenton - Harrogate line in 1845, and the eighteen-mile route was staked out in September of that year. It was opened in two stages, with the first 13-mile section between Church Fenton and a temporary terminus at Spofforth opening on 10 August 1847. There were intermediate stations at Stutton, Tadcaster, Newton Kyme, Thorp Arch and Wetherby, with passengers being conveyed the last five miles into Harrogate by horse-drawn omnibus. The only engineering feature of note was a two-span iron girder bridge over the River Wharfe between Newton Kyme and Thorp Arch.

The shorter five-mile section between Spofforth and Harrogate took a further year to complete owing to much more difficult terrain, with a gradient of 1 in 36 taking the line up to the unusually narrow 825yd Prospect Tunnel in which trains were not permitted to pass; then 300yd from the tunnel portal, the line crossed the 624yd, 31-arch, Crimple Viaduct which towered 110ft above the valley floor at its highest point.  Beyond the viaduct the line went through the 400yd Brunswick Tunnel before entering the terminus at Harrogate Brunswick. (This was the official name of the station, although in timetables it was shown only as Harrogate). The extension to Harrogate opened, without prior announcement or ceremony, on 20 July 1848. 

The initial service was five trains per day in each direction with no trains on Sunday. Within two years this had been reduced to three trains each day, probably owing to the opening of the Leeds & Thirsk Railway just five weeks later on 1 September 1848; their station was 1¾ miles to the east at Starbeck.  When completed in July 1849, this line provided a more direct route to Leeds without the need to change at Church Fenton.  The L&TR had planned to extend their line into Harrogate, but this had to be shelved because of the higher than expected cost of completing their line between Leeds and Starbeck.

In an attempt to prevent competitors from encroaching on its territory, a direct Leeds to York railway was promoted by George Hudson through the Y&NMR. The construction of the line was authorised in 1846 and was to run from Copmanthorpe on the outskirts of York to Cross Gates, several miles east of Leeds, joining the Church Fenton to Harrogate line between Tadcaster and Stutton.

In 1849 George Hudson was forced to resign as chairman of the York & North Midland Railway following his involvement in dubious business activities. The collapse of railway investment in 1849 resulted in the abandonment of the project, but a ten-arch stone viaduct over the River Wharfe at Tadcaster had already been constructed. The need for the line evaporated with the opening of the Micklethorpe to Church Fenton line in 1869 although the viaduct did eventually see rail traffic in the form of a siding serving a flour mill on the east side of the river. The siding closed in 1955. The viaduct is Grade II listed and is owned by Tadcaster Town Council; it now carries a public footpath and cycleway.

The L&TR was renamed the Leeds Northern Railway in 1851, and it was joined by the East and West Yorkshire Junction Railway from York at Knaresborough, east of Harrogate. In 1854 the York & North Midland Railway amalgamated with the Leeds Northern Railway and the York, Newcastle & Berwick Railway to form the North Eastern Railway (NER) which brought control of all the railways in the region under one company.  The fledgling NER was quick to improve the railway layout around Harrogate.

The NER built a spur from the former L&TR line at Pannal to join the Y & NMR line west of Prospect Tunnel. Just short of Brunswick Tunnel another new line was built to join the line from Starbeck enabling trains to run into a new central station which opened on 1 August 1862. Brunswick station was closed; initially it was retained for goods traffic, but this was short-lived.  By 1880 the service between Harrogate and Church Fenton was restored to five trains per day. 

The North Eastern Railway soon had plans for other new lines in the region. One of the most ambitious was for a direct route between Leeds and Scarborough by-passing York.  For much of its route it would utilise existing lines, but it included new construction from Cross Gates to a junction with the Church Fenton - Harrogate line at Wetherby. On 5 May 1866 The York Herald reported that the Leeds - Wetherby Railway Bill had been put before the Select Committee of the House of Commons for a single line to run from the Leeds and Selby branch, near Cross Gates, to the Church Fenton and Harrogate Branch at Wetherby - a length of 10 miles 66 chains. New capital to be raised was £210,000, with borrowing power of £70,000. The work was to be completed in five years, under penalty. Tenders for the project were invited in November 1871 and seven firms responded with bids.

The Leeds to Scarborough line was eventually abandoned owing to the economic downturn, although some sections were completed including the Cross Gates - Wetherby line which opened on 1 May 1876 with intermediate stations at Scholes, Thorner, Bardsey and Collingham Bridge.  The junction at Wetherby faced Church Fenton so it was not possible to run trains into Harrogate. This was rectified in 1901 when the line was doubled and a new curve facing Harrogate was built at Wetherby.

Cross Gates - Harrogate now became an important alternative route to the L&TR which was used increasingly by goods traffic and by the recently introduced Liverpool to Newcastle passenger expresses, which we now able to avoid a reversal at Leeds. As this route by-passed Wetherby station, which was sited to the east of the town, a new Wetherby station opened on 1 July 1902 at the south end of the new triangular junction, with the old station being retained for goods.

In 1902 the Great Northern Railway started running express services from Kings Cross to Harrogate via the Church Fenton to Harrogate line, with three daily trains in each direction. These continued after the grouping in 1923 and included the prestigious 'Harrogate Pullman'.  Although the Cross Gates to Harrogate line was always considered the major route, the August 1906 timetable shows a good service on both lines with a mixture of stopping and express services. Express trains from London over the Church Fenton - Wetherby line had stopped running by 1947. 

Wetherby racecourse opened in 1891, and an untimetabed station was opened c1924 to serve it.  This was last used on 18 May 1959, but racecourse specials continued to run to Wetherby station from Bradford Exchange on race days until 1963. A new station called Penda's Way, between Scholes and Cross Gates, was opened on 5 June 1939 to serve the growing residential development in that area.

In March 1940, additional traffic came to the Church Fenton to Wetherby line when a Royal Ordnance Factory was opened at Thorp Arch just to the north of the station. It was constructed for the Ministry of Supply and built on a 450 acre site. It took 18 months to build and cost £5.9 million. Thorp Arch was considered to be an ideal site, away from the large centres of population, possessing a reliable water supply, good rail links and proximity to the A1 trunk road. Workers were brought in from Leeds, Selby, York and all surrounding areas. 10,000 people, mainly women, were employed there at the height of production, and it is believed to have had 619 buildings. In World War II it produced light and medium gun ammunition, heavy ammunition, mines and trench mortar ammunition for the Army; medium and large bombs for the RAF; and 20mm and other small arms ammunition for all three services.

It was linked to the London & North Eastern Railway, which was used in its construction, for supplying raw materials and for transporting away filled munitions. The factory was served by a 6½-mile single-track circular railway with four platforms for munitions workers: these were named River, Ranges, Roman Road and Walton. Special workmen's trains ran from Leeds and Bradford Exchange and from as far afield as Hull and Doncaster on Monday to Saturday calling at the four halts. The last passenger traffic was in 1957 when the five unadvertised trains were withdrawn.

ROF Thorp Arch closed twice: once after World War II and then finally after the Korean War in April 1958. Once production had halted, the site was gradually de-contaminated. In the early 1960s George Moore, a local businessman, bought most of the site and the development of the area as a trading estate began. The estate was later owned by Thorp Arch Limited Partnership, but is now known as Thorp Arch Estate and is owned by the trustees of Hanover Property Unit Trust. It comprises an area of over 100 businesses, including the Thorp Arch Retail Park. The most notable addition to the estate is the Northern Reading Room, Northern Listening Service and Document Supply Centre of the British Library, occupying what was the locomotive shed and engineering department. Another part is a prison, originally HMP Thorp Arch, now HMP Wealstun.

Whereas the route between Cross Gates and Harrogate maintained a reasonably frequent weekday service the train frequency via Tadcaster was drastically reduced after WWII. The winter 1937-8 LNER timetable showed 7 trains from Church Fenton to Leeds via Tadcaster on Monday to Friday in each direction, whilst there were twice as many between Leeds, Wetherby and Harrogate. No trains ran on Sunday. The first British Railways (North Eastern Region) timetable of summer 1948 had only three Monday-Friday trains via Tadcaster, but five on Saturday.  In summer 1950 only three trains to Leeds and two to Church Fenton were shown. By 1961 there was only one local morning train between Church Fenton and Leeds via Wetherby, and another, also in the morning, from Leeds to Tadcaster, which ran only as far as Thorp Arch on Saturday. No passenger service was shown from Tadcaster to Church Fenton. By 1963 only the 7.44 am departure from Church Fenton to Leeds was shown in the public timetable, the train actually having run from Leeds via Garforth. It is likely that its principal role was to carry parcels. In 1961 there were four trains between Harrogate and Leeds in each direction, with two additional trains between Wetherby and Leeds and one in the opposite direction. Long distance traffic between Leeds and Newcastle had continued to use the line, but this ended with the completion of the quadrupling of the East Coast main line in 1959. The earlier twenty freight trains between Harrogate and Wetherby (in each direction) had fallen to five by 1960.


In 1961 the recently introduced diesel service between Liverpool and Newcastle was switched from the Arthington route bringing new traffic to the Wetherby line. Although this route was slower it avoided a reversal at Leeds.  This renewed importance could not however save the lines. At the time of the Beeching enquiry, there was a maximum of eight passengers on the one train a day between Church Fenton and Leeds via Wetherby, with no regular passengers. There were a few more passengers on the Leeds to Wetherby route but competition from an improving bus service
eventually made passenger numbers unsustainable despite the increase in the number of commuters living in Wetherby. Stations had received minimal investment since Nationalisation, amounting to little more than painting the nameboards in BR(NE) tangerine and installing totem name signs at Wetherby.

Given that all stations were manned, together with sixteen signal boxes and three manually
operated level crossings (requiring 35 staff in total), and the number of steep gradients requiring the use of banking engines, it is of little surprise that it was considered uneconomical. At Wetherby station alone, 14 staff were employed attending to the needs of only 30 passengers per day. The economics of the Wetherby lines were, in fact, worse than the cautionary examples given in Beeching's report. It had a yearly operating cost of £57,000 compared to receipts of £9,000, though some argue that the Wetherby to Leeds route could have been made profitable with some adjustments. Local freight now consisted largely of house coal, the use of which was declining.

A notable headline at the time read 'First lamb to the Beeching slaughter', cheerfully further stating 'No regular passengers object at inquiry’, which was the case, but only for the Wetherby - Church Fenton line. It was also inaccurate in that the Newcastle – Washington service, earmarked by Beeching, had closed the previous September!  A decision was reached on 24 October 1963, the inquiry having taken just three months, with both lines closing to passengers from  6 January 1964. The original Wetherby station remained open for goods traffic until 4 April 1966.  The only section of the original route to remain open is the short section of line from the Crimple Viaduct (where the spur from Pannal joined the Church Fenton route to the junction with the line to the former Brunswick terminus. This section is used today by the frequent Leeds – Harrogate – Knaresborough – York services. A new station called Hornbeam Park opened just south of this junction on 24 August 1992.

In the late 1960s, it was evident that Wetherby was going to grow. In 1965 it was estimated that by 1981 the town's population would double to 12,000 and this estimate proved quite accurate.
There were ambitious plans to relieve growing congestion through the town centre and on the A58 and A661 by converting the disused railways into relief roads. These suggestions never came to fruition. In Railways around Harrogate, Volume 3 (1998) Martin Bairstow presents a compelling case, headed ‘A lost commuter route?’ for the restoration of passenger services between Leeds and Wetherby. He also remarks that the dieselisation of the service in January 1959 could have increased the use of the trains, but without improved frequency of trains that some neighbouring lines enjoyed, there was really no incentive to use them.

Some parts of the former railway tracks between Wetherby and Leeds have been used for housing development at Bardsey and Collingham Bridge. Sustrans National Cycle Network routes 66 and 67 use some of the remaining trackbed. This line is walkable from Cross Gates to a point south of Collingham where a landowner refuses access to a short section of the line. At Scholes muddy conditions are encountered, but this soon gives way to a grassy embankment with lots of sandstone bridges in situ. The most impressive stretch is just north of Thorner where the line passes through a very deep, narrow cutting with the Seacroft road soaring above on a high brick bridge. At Collingham the road bridge must be used to cross the Wharfe, but from the north bank a footpath follows the embankment, sandwiched between a golf course and the river, into Wetherby. A public footpath and cycleway follows the trackbed from the A1 (M) to Thorp Arch station and from Wetherby to Stofforth - this section of the path is known as Harland Way.

Click here to see Church Fenton to Harrogate gradients.

Tickets from Michael Stewart. Bradshaw from Nick Catford. Route map drawn by Alan Young.

Thanks to Martin Bairstow (author/publisher), Peter Tuffrey (author) and the Wetherby Historical Trust who supplied many of the photos used in this feature.

Sources:

To see other stations on the Harrogate - Church Fenton line
click on the station name:
Harrogate Brunswick, Hornbeam Park, Crimple, Spofforth, Wetherby (1st site), Wetherby Racecourse, Newton Kyme, Tadcaster,
Stutton & Church Fenton
See also River Platform, Ranges Platform, Roman Road Platform &
Walton Platform on the ROF Thorp Arch Military Railway.
Special feature: Royal Ordnance Factory 8 - Thorp Arch

To see stations on the Cross Gates - Wetherby line click on the station name: Cross Gates, Penda's Way, Scholes, Thorner, Bardsey, Collingham Bridge and Wetherby (2nd site)


A Harrogate train waits to depart from Thorp Arch station c1908. The nearest part of the building with the gable end facing the platform is the booking office, which is approached through a covered walkway onto the platform along the side of the building. The waiting rooms are in the central recessed section of the building at the back of the four-bay canopy.



1891 1:2,500 OS map shows the general layout of the goods yard which remained largely unaltered. To the north of the station there is a loop siding with a short siding running into the goods shed from the loop. A small loading dock is seen alongside the loop with an end-dock at the north end. To the west of the loop two sidings run over coal drops. The signal box is seen on the far side of the level crossing on the up side. A weighbridge is shown at the entrance to the goods yard to the
north of the station building.

1909 1:2,500 OS map shows no change to the track layout.

1962 1:2,500 OS map shows the connections to the Thorp Arch Royal Ordnance Factory railway. Although the factory had closed in 1958 and the track has been lifted the trackbed is still clearly shown. Being a military site the factory was omitted from maps until after closure.

Looking north-west across the level crossing towards Thorp Arch station c1950s. By this date ROF Thorp Arch had opened and the signal box had been renamed Thorp Arch West. The points in the foreground are at the junction with the line into the munitions factory. A Class B passenger service from Leeds stands in the up platform. 61256 was built in 1947 to Thompson's successful B1 design at North British Loco Company. Entering service on 17 November at Leeds Neville Hill shed it lasted until withdrawal from 50A, York North shed, on 7 November 1965. It was sold to Drapers of Hull for scrapping during December of that year.
Photo from John Mann collection

The down platform at Thorp Arch seen from a departing southbound train in April 1954. Note one half of the covered walkway at the end of the building has been boarded and glazed. The station running-in board shows Thorp Arch for Boston Spa. This suffix never appeared on tickets and in the timetable above it is a footnote. The suffix was officially dropped on 12 June 1961.
Copyright photo by H C Casserley

90461 is seen working a class H freight through Thorp Arch in the 1950s. This WD 2-8-0 was built for the Ministry of Supply in 1944 at The North British Vulcan Company works and entered WD service in May of that year numbered 8651. It was renumbered in 1945 by the WD to 78651 before passing to BR in 1949 and receiving the number 90461. Withdrawal came in early 1963 followed by scrapping at Darlington works later that month. A standard design North Eastern Railway waiting
room is seen on the up platform.
Photo from John Mann collection


Looking north-west from Thorp Arch level crossing in 1959. The full range of station buildings is visible in this view. The station building comprises from left to right: booking office, waiting rooms and stationmaster's house. Beyond the building the large stone goods shed is seen. All of the structures were designed by G T Andrews who was architect of most of the
York & North Midland Railway buildings.
Copyright photo from Stations UK

A DMU from Church Fenton bound for Leeds waits in the down platform at Thorp Arch in July 1960. Dieselisation of the service took place in January 1959.
Photo by Chris Gammell

Thorp Arch station forecourt in 1964; the entrance to the ticket office is seen on the right.
Photo from Wetherby Historical Trust from Matt Higgins Flickr photostream

Thorp Arch goods shed in 1964. This is a G T Andrews-designed building and is very similar to the goods shed at Wetherby. The building is constructed from squared Magnesian Limestone blocks with a Welsh slate roof. The wide 2 x 2-bay canopy on the end of the building is unusual. Note the cast iron columns with fretted braces beneath a boarded frieze. Noted also the arched cut-out in the frieze over the siding that ran through the shed. Three lunettes are seen in the side wall matching another three on the opposite side. This building was Grade II listed in 1988.
Photo from Wetherby Historical Trust from Matt Higgins Flickr photostream

Looking north-west along the down platform at Thorp Arch station in 1964.
Photo from Wetherby Historical Trust from Matt Higgins Flickr photostream

Thorp Arch station looking south-east towards the level crossing in July 1972
Photo by John Mann

Thorp Arch down platform seen from the level crossing in April 1976.
Photo by Alan Young

Thorp Arch station building and down platform seen from the site of the now-demolished up platform. Externally there have been few changes to the station building. The entrance and booking lobby were in the ‘loggia’ on the left side of the building. Note the three Gothic windows with trefoil heads in the booking office gable-end and the triangular opening high on the wall above them. On the far right a ground floor bay window overlooks the platform. This was the stationmaster's sitting room, and is a standard feature in GT Andrews’ stations allowing the stationmaster to look both ways along the platform. An upper floor has been added to the north end of the central section of the station building
Photo by Nick Catford

Click here for more pictures of Thorp Arch station

 

 

 

[Source: Nick Catford]


Home Page
Last updated: Friday, 26-May-2017 08:55:14 CEST
© 1998-2013 Disused Stations